KURVATEK Vol. No. November 2025, pp. e-ISSN: 2477-7870 p-ISSN: 2528-2670 SQUEEZE CEMENTING PLANNING USING BALANCE PLUG METHOD IN LOSS FORMATION ON AuTBN-10Ay WELL Wahyu Prasetyo1,*. Lia Yunita2 Petroleum Engineering. Universitas Proklamasi 45 Yogyakarta Jalan Babarsari. Caturtunggal. Depok. Sleman. Yogyakarta 55281. Indonesia *Email corresponding: wswahyuprasetyo@gmail. Email: yunitalia478@gmail. 1,2, How to cite : W. Praseto and L. Yunita, "Squeeze Cementing Planning using Balance Plug Method in Loss Formation On AuTbn-10Ay Well," Kurvatek, vol. 10, no. 2, pp. 199-206, 2025. 33579/krvtk. 6246 [Onlin. Abstract AiTBN-10 well in Subang field is a production well that has experienced a decline in productivity, so it was decided to close the perforation zone in layer 9C using the squeeze cementing method and open a new perforation in layer 9D. This work faces challenges in the form of a loss circulation zone in the Baturaja formation, so it is necessary to plan the appropriate cement method and composition. This study is aimed to sealing the non-productive perforated zone prior to reperforation during the recompletion process to a new The squeeze cementing method is carried out using the balance plug method, accompanied by the selection of class G cement and special additives such as BAF-14L. BAR-19L. BAL-22L. BAG-17L, and BAF26L to overcome high pressure conditions, high temperatures, and potential gas disturbances and fluid loss. The calculation of slurry volume, water head, water behind, displacement, and slurry specifications was carried out in detail resulting in a slurry requirement of 15. 10 bbl. Laboratory test results showed a thickening time value of 4 hours 29 minutes at a consistency of 100 Bc and a compressive strength of 623 psi in 24 hours. Field evaluation showed that the cementing work successfully formed good isolation on the old perforation zone and allowed the opening of a new, more productive zone. This work successfully repaired the well integrity and became the basis for a workover strategy with a target of significantly increasing production from more economical layers. Keywords: Balance. Loss. Squeeze . Cementing INTRODUCTION Subang field is a field managed by Pertamina EP, one of which is in the Baturaja formation which is one of the productive carbonate formations in western Indonesia. The character of the Baturaja formation comes from the early Oligo-Miocene period which is composed of carbonate rocks . imestone/dolomit. with secondary porosity such as fractures and vuggy. This formation undergoes a dissolution process . which improves reservoir quality. The dominant type of fluid produced in this formation produces oil and formation water, sometimes dissolved gas . olution ga. is found depending on the reservoir pressure. Several wells in the Subang field use artificial lift production methods such as SRP. ESP or gas lift depending on reservoir pressure and production rate. Common production problems include water coning/water breakthrough caused by close water contact, scaling and formation damage due to carbonate properties, potential loss of circulation during drilling or cementing, common in the Baturaja carbonate TBN-10 well is one of the active production wells in the Subang field producing oil and gas hydrocarbons produced with ESP since 2019, over time the well experienced a decrease in production in 2024 due to the reservoir layer being unproductive. The technical problem of decreasing production rates is a problem that often occurs in wells that have been in production for a long time, this can be due to the potential of the reservoir that has decreased or the less than optimal artificial lift method used. The solution to this case is based on field studies and several studies, it is stated that the reservoir layer in this well still has the potential to be produced by carrying out workovers, reworking the layer in the new perforation zone and isolating it in the old perforation zone, one of the jobs is by squeeze cementing. Map of Subang field location is shown Figure 1. Received Oct 5, 2025. Revised Nov 24, 2025. Accepted Nov 24, 2025 DOI : https://doi. org/10. 33579/krvtk. TBN-10 WELL SUBANG FIELD Figure 1. Location Subang Field Squeeze cementing in general is a process where cement slurry is pumped with a specified pressure to a certain point with the aim that the slurry will occupy the zone to be squeezed. The slurry squeezed into the perforation zone will harden and occupy the area. Squeeze cementing can be applied during drilling operations, completion or during workover. The purpose of squeeze cementing is . Closing the formation that is no longer productive. Repairing leaks that occur in the casing. Repairing poor primary cementing. Closing the loss circulation zone. To perform squeeze cementing only requires relatively little cement but must be placed at the right point in the well. For that, good planning is needed, especially cement slurry planning, pressure determination and the use of appropriate methods/techniques so that the work is successful. This research was conducted on the TBN-10 well as research data because the 9C layer is no longer economical, besides that in this well there are other layers that are more prospective and the well conditions support the work of squeeze cementing using the balance plug method, so squeeze cementing planning is carried out to close the perforation zone in the TBN-10 well. This balance plug cementing technique is usually carried out on formations that require low pressure or in cases of loss zone wells. Tubing and drill pipes are lowered into the wellbore at a predetermined depth for cementing. A properly designed squeeze cementing operation will seal the gap between the formation and the casing. After hardening, the cement forms an impenetrable solid. Salt water from the formation is first pumped until it fills the casing through the tubing to clean the Then the slurry is placed into the perforation interval through the tubing by pumping a spacer or fresh water in front . ater hea. and behind . ater behin. the slurry so that the slurry is not contaminated by salt water or mud. The volume of water head required is 20 bbl, then the volume of water behind required 66 bbl, the volume of slurry required is 15. 10 bbl. During the cement slurry placement process, the casing valve at the wellhead is opened. Cement slurry is pumped into the target zone which will be closed until the height is the same between inside and outside the tubing . alance plu. Then the tubing or string is slowly lifted upwards leaving the cement slurry at a predetermined height until it is above the height of the spacer, then reverse circulation is carried out, namely recirculating salt water from the casing into the Reverse circulation is carried out to clean the remaining slurry that is still stuck to the tubing and remove it through the tubing by pumping salt water from the casing into the tubing. Salt water is pumped again through the tubing to provide pressure to the slurry until the predetermined pressure is reached with the aim of inserting the slurry into the perforation zone to be closed. After the squeeze target is reached, the pressure is held by closing all valves with the aim of keeping the force constant to hold the pressure in the casing until the cement hardens. The waiting on cement process is carried out for 24 hours for the maximum cement hardening capacity or based on laboratory test samples. The selection of cement is carried out based on cementing needs. The cement used in the cementing operation of an oil well is usually classified according to API standards. The classification of cement from API consists of cement classes A. The classification of cement classes is based on the ability of cement according to well needs because it affects pressure, temperature, depth, permeability and viscosity. The cement that is often used is class G because it is more flexible to use in various well conditions by adding a composition of several additives as needed. Some of the functions of additives include . KURVATEK Vol. No. November 2025: 199 Ae 206 KURVATEK e-ISSN: 2477-7870 p-ISSN: 2528-2670 Prevent circulation loss. Increase cement strength. Accelerate/slow down cement hardening time. Increase/decrease cement specific gravity. Increase durability. Before the planning is applied to the well, an injectivity test is carried out to see whether the planning is feasible to apply. Some of the functions of the injectivity test process include: Estimating the pressure when squeezing is done. Estimating the volume of slurry used. Ensuring that the perforation zone is open and ready to be occupied by fluid. Obtaining an estimate of the cement slurry injection rate. II. METHODS The research method uses a descriptive method, namely a research method that provides a complete picture of the object being studied by describing various variables and calculation processes related to the problem and unit being studied. The data used are well data such as well depth, casing dimensions, tubing. DP, perforation. BHST, cement classification based on API standards and cementing additives (Figure . Figure 2. Cement Classification Based on API The data processing process begins with determining the cement used based on the well profile and cement classification, calculating the volume of cement during tubing out and tubing in, then calculating the volume of water head, water behind and displacement show Figure 3. Start Data Input Well Depth Casing (OD. ID) Drill Pipe (OD. ID) DP. DC Length Tubing (OD. ID) Perforation BHST Cementing Additives Calculation of slurry volume, water head, water behind, spacer, raise up, reverse circulation. Analysis and evaluation of squeeze cementing work from thickening time graph, compressive strength. Calculation and Analysis Conclusion Finish Figure 3. Research Flow Chart Squeeze Cementing Planning Using Balance Plug Method In Loss Formation On AuTbn-10Ay Well (Wahyu Prasetyo and Lia Yunit. DOI : https://doi. org/10. 33579/krvtk. The calculation was done using Microsoft Excel software. Because the TBN-10 well experienced a loss circulation zone case, to overcome this before squeeze cementing was carried out, namely by creating a zone plug system with high viscosity slurry specifications, after the loss circulation was overcome, squeeze cementing was carried out in the perforation zone and cementing had passed the waiting on cement period for 24 hours, the cementing results were evaluated using thickening time and compressive strength data by applying pressure to the hardened cement. To calculate the slurry volume, it can be calculated using the equation below . Slurry Job Squeeze Cementing is calculated using the equations below: Capacity When Tubing In: A Cement Height Calculation When Tubing Inside (TOCAoA. 745 x Volume Total Squeeze High Cement (MTR) = (ID Casing2Oe OD Tubing. (ID Tubing. A Waterhead Height Calculation 20 bbl Volume WB Tubing x 313. Waterhead Tubing Height (MTR) = (ID Tubing2 ) DP Waterhead Height (MTR) = A Volume WB DP x 313. (ID DP2 ) ID Tubing2 ID DP2 Volume of Water Behind DP (BBL) = 313. 745 x Height Waterhead ID Tubing2 Disp Volume DP 2 x 313. ID DP2 DP Displacement Height 2 7/8 (MTR) = Capacity When Tubing Out: A Calculation of Cement Height When Tubing Assembly is Lifted (TOCA. Volume Total Squeeze x 313. X (MTR) = ID Casing2 Displacement Volume Calculation Volume Displacement (BBL) = 313. 745 x Height Displacement A . Water Behind Volume Calculation Volume of Water Behind Tubing (BBL) = 313. 745 x Height Waterhead Calculation of Cement Height After Squeeze Vol Total SqueezeOeVol Squeeze x 313. Slurry Height (MTR) = ID Casing2 Calculation of Number of Cement Bags Vol Total Squeeze x 5. Sak = Yield BBL = Total Sak x Yield x 0. Calculation of Estimated Rise Up/POOH Tubing After Pumping = Open End (MTR) Ae Last Height WH/WB Calculation of Estimated Squeeze Volume Based on Gun Perfo Type and Loss Level = Perforation x 0. 1874 x 2 x 3. x Faktor Loss Calculation of Estimated Squeeze Volume Based on Injection Rate 11000 x Rate X (BBL) = Pressure x Yield x 0. Calculation of Maximum Squeeze Pressure X (PSI) = Max Frac Pressure Ae Total Hydrostatic Pressure Calculation of Maximum Frac Pressure X (PSI) = Frac Gradient x Total Depth x 3. Calculation of Total Hydrostatic Pressure = Hydrostatic cement Hydrostatic WH/WB Hydrostatic Displace Calculation of Hydrostatic Cement = 0. 052 x (Height MTR OE-Height MTR TOCA. x Density x 3. Calculation Hydrostatic WH/WB X (PSI) = 0. 052 x (Height MTR DP 2 7/8-Height MTR WH/WB) x SG Water . x Water Density . Calculation Displace = 0. 052 x Height Displace x SG Water . x Water Density . KURVATEK Vol. No. November 2025: 199 Ae 206 KURVATEK e-ISSN: 2477-7870 p-ISSN: 2528-2670 i. RESULTS AND DISCUSSION The method used to analyze cement bonding quality is the Ultrasonic Imager Tool (USIT). The USIT can interpret the condition of the cement, casing, and the type of material . iquid and ga. behind the casing. Next, squeeze cementing is designed to improve poor cement bonding quality . The balance plug method will be used in the implementation of squeeze cementing of this well. This method was chosen because it is more economical, more practical and requires a relatively minimal amount of equipment. The main equipment needed includes a cementing unit, rig unit, and production tubing . The background for doing squeeze cementing is to repair primary cement or to close productive zones that are no longer economic . This technique emphasizes the balance between pressure from the formation and pressure from the surface, while still considering the strength of the casing and the resistance of the formation to pressure, so that no fractures occur when the slurry is forced into the perforation zone . Before implementing the squeeze cementing operation, it is necessary to identify and analyze the cementing parameters that will be This is important for compiling work steps and performing technical calculations on the TBN-10 well, based on perforation data and each well profile. Based on the cementing material requirements for this work, class G cement is used because this cement has high pressure and temperature resistance, is flexible at well depth, is easily adjusted with the desired additives, good cementing evaluation results with formation/casing, and is resistant to the effects of formation water. Additives used in slurry mixing in squeeze cementing work include (BAF-14L) containing organic salts used to reduce slurry viscosity, (BAR-19L) slowing down the hardening of cement suspension at high temperatures, (BAL-22L) controlling cement fluid loss and maintaining slurry in stable conditions, (BAG-17L) used as a gas controller with this material strengthening the binding of cement slurry, (BAF-26L) preventing air from being trapped in the slurry during mixing. Because the TBN-10 well formation experiences a loss zone, before squeeze cementing is carried out, the necessary additives are used, namely (BAX-. to reduce the increase in viscosity in cement due to bacterial activity, (KCL) to stabilize the clay/shale formation so that it does not expand when in contact with slurry, (BGA-. to reduce control of filtrate loss because the gel closes the pores of the formation, (BBF-01L) to extend viscosity stability during pumping time, (BXL-. to increase the thermal stability of the slurry to high temperatures. Slurry Job Squeeze Cementing Planning Results Below are the calculation results of the planning of slurry volume. WH/WB volume, displacement volume in squeeze cementing work to close the perforation zone with the target of re-working the layer. Table 1. Slurry Volume Calculation Results when Tubing In Parameter Nilai Tubing 2 7/8AoAo Cap Casing 7AoAo Ae Tubing 2 7/8AoAo Cap Casing 9 5/8AoAo Ae Tubing 2 7/8AoAo Cap Tubing 2 7/8AoAo (Casing 7AoAo-Tubing 2 7/8AoA. Slurry Height Parameter Cuft/Ft Cuft/Ft Bbl/Ft Bbl/Ft Cuft/Ft Bbl/Ft Cuft/Ft Bbl/Ft DP 2 7/8AoAo Cap Casing 7AoAo-DP 2 7/8AoAo Cap Casing 9 5/8-DP 2 7/8AoAo Cap Tubing 2 7/8 (Casing 9 5/8AoAoTubing 2 7/8AoA. Nilai Cuft/Ft Cuft/Ft Bbl/Ft Bbl/Ft Cuft/Ft Bbl/Ft Cuft/Ft Bbl/Ft 60 Bbl Table 2. Water Head Volume Calculation Results Parameter WH Height at 7AoAo Casing-Tubing 2 7/8AoAo WH Height at 9 5/8AoAo Casing-Tubing 2 7/8AoAo WH Height at 9 5/8AoAo Casing-DP 2 7/8AoAo Total Nilai 35 Bbl 33 Bbl 33 Bbl 00 Bbl Table 3. Results of Water Behind Volume Calculation Parameter WH Height at Tubing 2 7/8AoAo WH Height at DP 2 7/8AoAo Total Nilai 37 Bbl 29 Bbl 66 Bbl Squeeze Cementing Planning Using Balance Plug Method In Loss Formation On AuTbn-10Ay Well (Wahyu Prasetyo and Lia Yunit. DOI : https://doi. org/10. 33579/krvtk. Table 4. Results of Volume Displacement Calculation Parameter Disp Volume Tubing 2 7/8AoAo Disp Volume DP 2 7/8AoAo Disp Volume Total Nilai 37 Bbl 48 Bbl 85 Bbl Table 5. Slurry Volume Calculation Results when Tubing Out Parameter Casing Capacity 7AoAo Squeeze Volume Total Volume Nilai 2148 Cuft/Ft 64 Bbl Nilai Dead Volume Total 48 Cuft 28 Cuft 77 Cuft 10 Bbl 5 Bbl Table 6. Slurry Specification Calculation Results Parameter Excess Slurry Volume Sack of Cement Density Yield Water Total Mixing Fluid Nilai Satuan Sack Cuft Sack Ppg Cuft/Sx GPS GPS Nilai Satuan Bbl Bbl Evaluation of Job Squeeze Cementing Results After the squeeze cementing work is carried out, to ensure whether the work results have been successful, an evaluation or testing of the cementing results is carried out, one of the tests carried out is the thickening time test to determine the working time before the cement slurry begins to thicken and can no longer be pumped, compressive strength testing to determine the waiting on cement time, namely the waiting time before the well can continue operations and to determine the ability of the hardened cement to withstand pressure from the formation. Figure 3. Laboratory Test Results Based on the image above is the result of the slurry test in the laboratory from several parameters, namely, thickening time, fluid loss, free water, rheology and compressive strength. The results of the thickening time were obtained with a time of 4 hours 29 minutes at 100 Bc with a compressive strength of 623 psi for 24 hours. KURVATEK Vol. No. November 2025: 199 Ae 206 KURVATEK e-ISSN: 2477-7870 p-ISSN: 2528-2670 Figure 4. Thickening Time The image above is a graph showing the results of the thickening time test. From the graph it is analyzed that the temperature from the first 40 minutes rose to 210EO then stabilized until 04. 30, this indicates that the well conditions are stable and under control, there is no premature thickening, the slurry consistency remains below 40 Bc for the first 4 hours before reaching the critical point of thickening time at 70 Bc and begins to increase sharply at 04. 20 reaching >70 Bc which means the slurry has a working time of 4. 5 hours which is sufficient to pump the slurry to the target zone and adjust the squeeze pressure. Figure 5. Compressive Strength The image above is the result of the compressive strength test where the compressive strength begins to form after the first 2 hours at 02. 00, the strength of 500 psi after 10 hours there is a steady increase to 623 psi at 24 hours, the temperature at 02. 00 reaches 240EO and is stable until the end shows that the laboratory simulation is quite representative of BHST, at the initial high transit time there is a decrease at 00 then stable which indicates the beginning of the initial hardening set. The behavior of transit time with a consistent initial set shows good slurry quality and additive design. Based on these parameters, the cement managed to reach 500 psi in 10 hours in accordance with industry regulations as the minimum strength before carrying out further work, at 24 hours the maximum compressive strength of 800 psi is sufficient for sealing and withstanding formation pressure. It can be concluded that the results of cementing for closing the perforation zone in the TBN-10 well have hardened well. IV. CONCLUSION This study designs the slurry requirements for the squeeze cementing operation using the balance plug method in well TBN-10 aimed at sealing the non-productive perforated zone prior to reperforation during the recompletion process to a new formation. Loss circulation zone, a slurry volume of 20 bbl was required within the plug interval of 1930. 6-2040 mMD. The operation was considered successful as only a minimal amount of slurry was lost into the formation. P erforated zone was sealed at a depth of 2002-2008 mMD in layer 9C, with a calculated slurry volume of 6. 64 bbl successfully squeezed at a low pressure of 600 psi from a total planned volume of 15. 10 bbl. Balance plug length while the workstring was in the well reached Squeeze Cementing Planning Using Balance Plug Method In Loss Formation On AuTbn-10Ay Well (Wahyu Prasetyo and Lia Yunit. DOI : https://doi. org/10. 33579/krvtk. 9 meters, with a slurry column height of 123. 52 meters. After pulling out of hole (POOH) for 10 stands, the slurry height was reduced to 120. 26 meters. The squeeze cementing operation using the balance plug method proceeded successfully. A total of 64 bbl of slurry entered the perforation zone, while the remaining 8. 46 bbl formed the fluid column from the planned total of 15. 10 bbl. This remaining volume is sufficient to fill the fluid column below the target zone and up to the casing. The waterhead ahead of the cement, acting as a spacer was 20 bbl, the water behind the cement was 1. 66 bbl and the displacement volume used as a pusher and fluid cleaner was 26. The thickening time chart indicated that the slurry consistency remained below 40 bc during the initial 4 hours, meaning premature thickening did not occur before reaching the critical point of 70 bc. A working time of 4. 5 hours was deemed sufficient for pumping into the target zone and adjusting the squeeze pressure. The evaluation of the squeeze cementing job based on the compressive strength chart showed stable temperature and transit time, indicating the onset of cement setting. The cement reached a strength 0f 500 psi within 10 hours, regulation the industry minimum requirement before proceeding with further operations and achieved a maximum strength of 800 psi, sufficient for sealing and holding the formation ACKNOWLEDGEMENTS Thank you to PT. Bukit Apit Persada for Supporting this research REFERENCES