TELKOMNIKA. Vol. No. June 2012, pp. ISSN: 1693-6930 accredited by DGHE (DIKTI). Decree No: 51/Dikti/Kep/2010 Optimization and Feasibility Analysis of Satellite Earth Station Power System Using Homer Hanaa T. El-Madany . Faten H. Fahmy . Ninet M. El-Rahman . Hassen T. Dorrah Electronics Research Institute. National Research Center Building. Cairo. Egypt Electrical Power & Machines Dept. Cairo University. Egypt e-mail: hanaa_tolba@yahoo. Abstrak Stasiun satelit bumi yang terletak di daerah terpencil adalah salah satu dari banyak aplikasi yang didukung oleh sumber energi terbarukan. Sistem bumi untuk satelit terdiri dari stasiun bumi dan pusatpusat kendali yang bekerja sama untuk mendukung satelit dan pengguna data. Stasiun bumi terdiri dari subsistem utama, pemancar, penerima, antena, peralatan pelacakan, peralatan antarmuka terestrial dan catu daya. Subsistem daya adalah bagian penting yang dibutuhkan untuk memasok stasiun bumi dengan daya listrik untuk terus berkomunikasi dengan satelit-nya. Makalah ini membahas simulasi dan penentuan ukuran optimal dari sistem daya stasiun bumi menggunakan software HOMER. Kombinasi dua sumber energi . urya dan angi. untuk menyediakan produksi tenaga listrik terus-menerus digunakan untuk menentukan operasi sistem yang optimal. Terdapat tiga konfigurasi sistem yang dibandingkan dalam hal net present cost (NPC) and levelized cost of energy (COE). Juga, sebuah studi secara ekonomis akan dianalisis dalam aspek permintaan energi dan analisis sensitifitas akan dilakukan. Kata kunci: daerah terpencil. HOMER, photovoltaic, stasiun bumi, ukuran optimal Abstract Satellite earth stations which located in remote areas are one of many applications powered by the renewable energy sources. Ground system consists of ground station and control centers working together to support the spacecraft and the data user. Earth station consists of major subsystems, transmitter, receiver, antenna, tracking equipment, terrestrial interface equipment and power supply. Power subsystem is an important part that required for supplying the earth station with electrical power to continue communicating with its remote sensing satellite. This paper deals with simulation and optimal sizing of earth station power system using HOMER software. A combination of two energy sources . olar, and win. to provide a continuous electric power production is used to determine the optimum system Three system configurations are compared with respect to the total net present cost (NPC) and levelized cost of energy (COE). Also, economical study will be analyzed for energy demand and sensitivity analysis will be performed. Keywords: earth station. HOMER, optimal sizing, photovoltaic, remote area Introduction Terrestrial solar photovoltaic (PV) systems are presently economical for many remote applications, where the cost of other alternatives, such as extending utility power lines or transporting fuel, are very high. Telecommunication is one of several applications of renewable energy in remote areas. The functional elements of an earth station are shown in Figure 1 . The earth station consists of four major subsystems, transmitter, receiver, antenna, and tracking equipment . Two other important subsystems are terrestrial interface equipment and power These components do not significantly change with the type of spacecraft being controlled, and therefore applies to several applications such as earth observation, remote sensing, and telecommunications. It is also applicable to low earth orbits as it is to geostationary orbits or interplanetary orbits. Power system is required for supplying all mentioned subsystems with electrical power demand. This paper investigates the life cycle cost analysis for the power system. Also, the optimal sizing and cost evaluation using HOMER software is presented. Received December 19, 2011. Revised May 5, 2012. Accepted May 14, 2012 ISSN: 1693-6930 Baseband Research Method Site Selection The procedure to determine where the earth station is to be installed is generally known as the site selection process. Although a set of "rules" for site selection has not been adopted, there are certain guidelines that are generally adhered to in selecting the most appropriate site. The ground should be capable of bearing the load of the earth station antenna and building. This is of particular concern for the larger and heavier antenna structures. Radio frequency interference must be minimized between the earth station and other telecommunication service. Most receiving earth stations that are found in rural and remote areas require an environmentally clean power supply. At the same time, the electrical load of the receiving earth station is critical and requires a continuously power supply. From this point of view, it is important to introduce a model for a receiving earth station powered by using photovoltaic system. Aswan was selected as the site under consideration because it enjoys very high level of solar radiation. Aswan is located at Latitude 24 04' north and Longitude 32 57' east . igh power Tran ow noise Rec Trackin g equipment ower supply Figure 1. General configuration of an earth station Power System Implementation Using Homer HOMER is a computer program that simplifies the task of evaluating design options for both off-grid . tand-alone, and hybri. system and distributed generation (DG) applications . has been developed by United State (US) National Renewable Energy Laboratory (NREL) since It is developed specifically to meet the needs of renewable energy industryAos system analysis and optimization. There are three main tasks that can be performed by HOMER: simulation, optimization and sensitivity analysis. In the simulation process. HOMER models a system and determines its technical feasibility and life cycle. In the optimization process. HOMER performs simulation on different system configurations to come out with the optimal selection. In the sensitivity analysis process. HOMER performs multiple optimizations under a range of inputs to account for uncertainty in the model inputs. HOMER has been used as the sizing and optimization software tool for the receiving earth station power system. The power system consists of a renewable energy sources . olar energy, and wind turbin. , batteries for energy storage and power inverter to maintain the flow of energy between the AC and DC sides. Figure 2 shows the proposed scheme as implemented in the HOMER simulation tool. Economic Criteria Based on LCC Concept The economical approach, according to the concept of Life Cycle Cost (LCC), is developed to be the best indicator of economic profitability of system cost analysis in this study. The LCC method of economic analysis calculates a system's total cost over its useful life. This TELKOMNIKA Vol. No. June 2012 : 359 Ae 470 TELKOMNIKA ISSN: 1693-6930 method takes into account the initial . and all other costs required for the system to operate properly over its life . Four main parts are considered: PV array, wind turbine, battery bank, and the inverter. According to the studied system. LCC takes into account the initial capital cost (CIC), the present value of replacement cost (Crep ), the present value of operation and maintenance cost (CO&M ), the salvage value (Sa. Thus. LCC may be expressed as follows . - . LCC($) = CIC Crep Co&M Oe Sal The Initial Capital Cost The initial capital cost of each system component consists of the component price, including systems design and installation costs. This is a one-time payment at the start of a Then the initial capital cost for the PV/wind/battery system, (CIC) is given by . , . CIC = (PPV * CiPV ) (Pw * Ciw ) (Cbt * Cibat ) (Pinv * Ciinv ) . where (PPV . Cip. are the total capacity . W) and unit cost ($/kW) of PV array respectively. (Pw . Ci. are the total capacity . W) and unit cost ($/kW) of wind turbine respectively. (Cbt . Ciba. are the total capacity . and unit cost ($/kW. of the battery bank respectively. and (Pinv . Ciinv ) are the nominal capacity . W) and unit cost ($/kW) of the inverter respectively. The Replacement Cost Replacement costs present value reflects major repairs and equipment replacements which occur when the normal duty life of any system components is shorter than the life expectancy of the entire system. As the life period of battery bank and inverter are shorter than PV system. the replacement cost of the wind turbine, the batteries and the inverter have to be included in the cost analysis of the power system . The wind turbine will be purchased after 15 years. Therefore, the replacement cost of wind turbine can be calculated from: Crepw = Pw . Crepw . The group of battery bank will be purchased . fter N = 5, 10, 15, and 20 year. Therefore, the replacement cost of battery bank can be calculated from: C repb = C bt . C repbat . The inverter will be replaced after 15 years, so the replacement cost of inverter can be evaluated as follows: C repinv = Pinv . Crepinv . The present value of total replacement cost (Cre. can be determined as follows: Crep = CrepPV Crepw Crepb Crepinv where Crep is the total system replacement cost, (CrepPV . Crep. are the replacement cost of PV array ($) and the replacement cost of wind turbine ($) respectively, (Crepbat . Crepin. are the unit component cost battery bank ($/kW. and inverter ($/kW) respectively, and i is the interest rate . 25 %). Optimization and Feasibility Analysis of Satellite Earth StationA(Hanna T. El-Madan. ISSN: 1693-6930 Load (K w ) 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Figure 2. HOMER implementation of power system Figure 3. Earth station power system load The Operation and Maintenance Cost In its general form, the present worth factor of operation and maintenance (PWFO&M) and the present value of operation and maintenance cost of the PV/wind/battery system (CO&M ) are expressed as . N Oe 1 PWFO& M = CO&M = CO&MPV ( Pw . Co&Mw . PWFo&M ) ( Cbt . CO&Mbat . PWFO&M ) (Pinv . CO&Minv . PWFO&M ) where (CO&MPV . CO&Mw. CO&Mbat, and CO&Minv ) are the operation and maintenance cost of PV, wind turbine, battery bank and inverter respectively, and N is the system lifetime. Salvage Value Salvage present value or the recovery value of the equipment is the net value of the equipment used at the end of the system's service life. The salvage or the residual value of components is based on the possibilities of alternative uses at the end of the project lifetime. this analysis a salvage value can be calculated as follows . Sal = Crep . Rrem Rcomp Rrem, the remaining life of the component at the end of the project lifetime, is given by: Rrem = Rcomp Oe [ N Oe Rrep ] . Rrep, the replacement cost duration, is given by: Rrep = Rcomp . INT Rcomp where Crep. Rcomp, and Rproj are replacement cost ($), component lifetime . , and project lifetime . TELKOMNIKA Vol. No. June 2012 : 359 Ae 470 TELKOMNIKA ISSN: 1693-6930 Electrical Load Input Details The load details are inputs to the HOMER simulations. The load inputs describe the electric demand that the system must serve. The earth station power system load profile indicated in Figure 3. Resources Monthly average data of global solar radiation in Aswan are described in Table 1 . shown in Table I, the solar radiation data for the selected remote area are obtained to be in the range between 8. 02 kWh/m /d . n Jun. 39 kWh/m /d . n Decembe. The scaled annual average of the solar radiation is estimated to be 6. 49 kWh/m /d. The HOMER software can generate the clearness index from the solar radiation data according to the latitude of the place has been chosen. If the solar radiation data is not available, clearness index can also be used to generate the solar radiation data. Therefore, either the clearness index or the solar radiation data can be used to represent the solar resource input, as long as the data of latitude is available to the HOMER software. Also, the wind speed is indicated in Figure 4. It is cleared from Figure 4 that the most year months have wind speed values ranging from 4 m/s to 4. 77 m/s. Simulation Results and Discussion Three power systems configurations using different energy storage technologies, namely. PV/battery system, wind/battery system, and PV/wind/battery system are simulated in HOMER environment for optimal sizing which minimizes the system cost. The simulation results provide comparison among these configurations. Simulation studies are classified as: Case A (PV/battery syste. Case B (PV/wind/battery syste. , and Case C . ind/battery syste. Table 1. Monthly average values of daily global solar radiation . Wh/m /. over Aswan Month January February March April May June July August September October November December Daily Radiation kWh/m2/d Table 2. System components in Components Battery Inverter No. of Unit 45 kW 48 kWh 11 kW Figure 4. Wind speed Table 3. Net present costs in case A Component Battery Inverter System Capital ($) 247,500 180,336 8,800 436,636 Replacement O&M ($) ($) 233,437 85,278 2,512 4,598 235,950 89,876 Salvage ($) Total ($) 247,500 499,051 15,531 762,083 Case A: PV/Battery Power System The PV was used as the base load supply which produces DC power which is converted into AC power by using an inverter. Since the PV will charge the battery bank, this happens when there is extra power after meeting the demand of the end user load. If the PV cannot meet the demand, the battery bank will not be charged, but being discharged to cater for the demand. Optimization and Feasibility Analysis of Satellite Earth StationA(Hanna T. El-Madan. ISSN: 1693-6930 Table 2 shows the optimal unit size and number of units of each component in the Total net present cost . omprise of capital, replacement. O&M and salvag. of the PV stand alone system and its each component is illustrated in Table 3. The levelized cost of energy (COE) for Case A is equal to 0. 854 $/kWh. Case B: PV/Wind/Battery Power System This case has considered only battery as energy storage option with PV/wind energy power system. In this case PV and wind generator are the electric power generator devices. Therefore, 97% of total electrical production is obtained by the PV and 3% of total electrical production is obtained by the wind generator. The optimal unit size and number of units of each component in the system is shown in Table 4. Total net present cost of the complete system and its component is illustrated in Table 5, which is much higher compared to Case A due to the additional power generating device. The COE for this case . 868 $/kW. is higher than Case A. Case C: Wind/Battery Power System This case has considered only battery as energy storage option with wind turbine power In this case wind generator is the only electric power generator device. Table 5. Net present costs in Case B Table 4. System components in case Component Wind Turbine Battery Inverter No. Unit size 48 kWh 11 kW 42 kW 3 kW Component Capital ($) O&M ($) Salvage ($) Total ($) 231,000 18,600 Replacement ($) 4,567 Wind Battery Inverter System 5,079 231,000 27,557 180,336 8,800 438,736 233,437 2,512 240,517 85,278 4,598 94,955 -1,068 499,051 15,531 773,140 Therefore, 100% of total electrical production is by wind generator. The optimal unit size and number of units of each component in the system is shown in Table 6. Total net present cost of the complete system and its component is illustrated in Table 7, which is much higher compared to Case B due to single storage and power generating system. The COE . $/kW. for this Case is higher than the previous two cases. Table 6. System components in case C Components Wind turbine Battery Inverter No. of units Unit size 3 kW 48 kWh 11 kW Table 7. Net present costs in case C Component Wind turbine Battery Inverter System Capital ($) 390,600 318,240 8,800 717,640 Replacement ($) 95,916 411,949 2,512 510,377 O&M ($) 106,660 150,490 4,598 261,748 Salvage ($) -14,471 -14,850 Total ($) 578,705 880,679 15,531 1,474,915 Figure 5 includes the cost summary of the PV/battery system which indicates that the battery is very effective in calculating the total system costs due to the short life time . , so the battery is replaced 5 times during the project life time. From HOMER simulation, the use of standalone PV system was the cheapest, with the total Net Present Cost (NPC) of $ 762,083. This was according to the global solar irradiance of 6. 49 kWh/m /d. The monthly average TELKOMNIKA Vol. No. June 2012 : 359 Ae 470 TELKOMNIKA ISSN: 1693-6930 electric production is shown in Figure 6. The PV array provided energy of 103,050 kWh/year . %). Figure 5. Cost summary Battery Converter Figure 6. Monthly average electric production for PV/battery system Sensitivity Analysis A challenge that often confronts the system designer is uncertainty in key variables. Sensitivity analysis can help the designer to understand the effects of uncertainty and make good design decisions despite the uncertainty. A sensitivity analysis can be performed by entering multiple values for a particular input HOMER repeats its optimization process for each value of that variable. An input variable for which you have specified multiple values is called a sensitive variable, and many sensitive variables can be defined. A sensitivity analysis can be referred to as one-dimensional if there is a single sensitive If there are two sensitive variables, it is a two-dimensional sensitivity analysis, and so HOMER's has the most powerful graphical capabilities which is developed to help and examine the results of sensitivity analyses of two or more dimensions . Sensitivity to Electrical Load and Wind Speed Primary load data may be specified with an annual average of 240 kWh/d, then specify 100, and 420 kWh/d for the primary load scaling variable. Also, wind speed ranges from 4. m/s to 10 m/s. The graph in Figure 7 shows that, for the assumptions used in this analysis . lobal solar radiation = 6. 49 kWh/m /d, and interest rate = 8. 25%), the PV/battery systems are optimal for small systems . p to 240 kWh/. and a wind speed up to 8. 5 m/s. At high wind speeds, as the load size is still up to 240kWh/d, the optimal system type changes to Wind/battery. At high wind speeds, as the load size increases, the optimal system type changes to PV/wind/battery. Optimization and Feasibility Analysis of Satellite Earth StationA(Hanna T. El-Madan. ISSN: 1693-6930 Optimal System Type System Types PV/Battery Wind/Battery Wind/PV/Battery Fixed Wind Speed . Global Solar = 6. 49 kWh/mA/d Interest Rate = 8. Re ce iving earth s tation Load . Wh/. Wh/. Figure 7. Sensitivity to electrical load and wind speed Sensitivity to Electrical Load and Solar Insolation Two parameters remains without any variations . ind speed=4. 35 m/s, and interest rate=8. 25%). While the scaling process changes the magnitude of the load data and global solar radiation. Figure 8 describes the sensitivity to load data and solar radiation. At solar insolation 5 kWh/m /d and 10 kWh/m /d, the PV/battery system becomes competitive to PV/wind/battery system up to 240 kWh/d load energy at . ind speed = 4. 35 m/s, and interest rate = 8. 25%) while PV/wind/battery is the optimal case at increasing the load sizes and the same range of solar insolation. Optimal System Type System Types PV/Battery Wind/PV/Battery Fixed Wind Speed = 4. 35 m/s Interest Rate = 8. Global Solar . Wh/mA/. Re ce iving e arth s tation Load . Wh/. Figure 8. Sensitivity to electrical load and global solar insolation Sensitivity to Wind Speed and Solar Insolation Two variables are considered, solar insolation and wind speed but the load and interest rate is still constant . oad energy = 240 kWh/d, and interest rate = 8. 25%). Figure 9 explores the feasibility to wind speed and solar radiation. The PV/battery system is the most economical solution at higher solar insolation and low wind speed, in contrast, the wind /battery is the competitive system at higher wind speed . 25 m/s and 10 m/. While the PV/wind/battery system is the optimal one at wind speed between 5. 2 m/s and 9. 2 m/s. TELKOMNIKA Vol. No. June 2012 : 359 Ae 470 TELKOMNIKA ISSN: 1693-6930 Optimal System Type System Types PV/Battery Wind/Battery Wind/PV /Battery Fixed WindSpeed. Receiving earth station Load = 240 kWh/d Interest Rate = 8. Global Solar . Wh/m A/. Figure 9. Sensitivity to wind speed and global solar insolation Sensitivity Results The PV production as a function of global solar radiation, wind speed, is shown in Figure 10 to Figure 11 respectively. The PV production increases with the global solar radiation. In contrast, it is inversely proportional to wind speed due to the wind energy system contributes with percentage of the total energy production. The total NPC versus the four data sets . oad energy, interest rate, global solar radiation, and wind spee. is presented in Figure 12 to Figure 15 respectively. It is found that, the NPC increases gradually with load energy due to more energy production are needed to cover the load demand. While the NPC decreased with interest rate, global solar radiation, and wind speed. As a result of, the unit size of each component in the system decreases to feed the same load. PV Production vs. Global Solar 105,500 Fixed Receiving earth station Load = 240 kWh/d Wind Speed = 4. 35 m/s Interest Rate = 8. PV Production . Wh/y. 105,000 104,500 104,000 103,500 103,000 Global Solar . Wh/m A/. Figure 10. PV production as a function of solar insolation Optimization and Feasibility Analysis of Satellite Earth StationA(Hanna T. El-Madan. ISSN: 1693-6930 PV Production vs. Wind Speed 120,000 Total Net Present Cost vs. Receiving earth station Load 1,300,000 Fixed Fixed Receiving earth station Load = 240 kWh/d Global Solar = 6. 49 kWh/mA/d Interest Rate = 8. Global Solar = 6. 49 kWh/mA/d Wind Speed = 4. 35 m/s Interest Rate = 8. 1,200,000 90,000 P V P ro d u c t io n ( k W h /y r ) T o ta l N e t P re s e n t C o s t ($ ) 1,100,000 1,000,000 60,000 900,000 30,000 800,000 700,000 Wind Speed . Figure 11. PV production as a function of wind Total Net Present Cost vs. Interest Rate 780,000 Receiving earth station Load . Wh/. Figure 12. Total NPC vs. load profile Total Net Present Cost vs. Global Solar 765,000 Fixed Fixed Receiving earth station Load = 240 kWh/d Global Solar = 6. 49 kWh/mA/d Wind Speed = 4. 35 m/s Receiving earth station Load = 240 kWh/d Wind Speed = 4. 35 m/s Interest Rate = 8. 760,000 760,000 T o ta l N e t P re s e n t C o s t ($ ) T o ta l N e t P re s e n t C o s t ($ ) 755,000 740,000 750,000 745,000 720,000 740,000 700,000 735,000 730,000 680,000 Interest Rate (%) Figure 13. Total NPC vs. interest rate Global Solar . Wh/mA/. Figure 14. Total NPC vs. global solar TELKOMNIKA Vol. No. June 2012 : 359 Ae 470 TELKOMNIKA ISSN: 1693-6930 Total Net Present Cost vs. Wind Speed 800,000 Fixed Receiving earth station Load = 240 kWh/d Global Solar = 6. 49 kWh/mA/d Interest Rate = 8. Total Net Present Cost ($) 750,000 700,000 650,000 600,000 Wind Speed . Figure 15. Total NPC vs. wind speed Conclusion Earth station is a vital element in any satellite communication network. The function of an earth station is to transmit/receive information to/from the satellite in the most cost-effective and reliable manner while retaining the desired signal quality. Power supply subsystem is an important system for supplying the earth station equipment with electrical power. Designing a power system would require correct components selection and sizing with appropriate operation Initial component sizing methods are based on worst month scenario leads to non optimal design with excess capacity. HOMER software program is used for simulating and optimizing the earth station power system. Three power system configurations are presented. PV/battery system. PV/wind/battery system and wind/battery system. These systems are compared with respect to the total net present cost (NPC) and levelized cost of energy. The total NPC of wind/battery system was still higher as compared to PV/battery system and PV/wind/battery system provided if the wind speed is low enough. For our site, the PV/battery configuration is the most economic solution under given resource and load conditions. The values of global solar irradiance, wind speed, interest rate, and load energy have been varied in order to determine the suitability of the implementation of the different types of energy systems. For this reason, sensitivity analysis is performed for three power system configurations. The total NPC of Wind/battery system was still higher as compared to PV/battery system and PV/Wind/battery system provided if wind speed is low enough. However, if the wind speed increases considerably, the total NPC of Wind/battery system would be the lowest among all other systems. On the other hand, if the global solar radiation and interest rate increase, the total NPC of PV/battery system would be the lowest among all other systems. The choice of the hybrid PV/Wind system is only feasible if the load energy increases. For our site, the PV/battery configuration is the most economic solution under given resources and load conditions. References