International Journal of Electrical and Computer Engineering (IJECE) Vol. No. February 2019, pp. ISSN: 2088-8708. DOI: 10. 11591/ijece. A comparative approach between different optimize result in hybrid energy system using HOMER Shweta Goyal1. Sachin Mishra2. Anamika Bhatia3 1Department of Electrical Engineering Graphic Era demmed to be University. India 2School of Electronics & Electrical. Lovely Professional University. India 3Department of Electronics Engineering Graphic Era demmed to be University. India Article Info ABSTRACT Article history: To compare the different result of optimization of a hybrid energy system. hybrid renewable energy system (HRES) is the combination of renewable and non-renewable sources which is playing a very important role for rural area electrification when grid extension is not possible or excessively Non renewable sources like diesel power generator . are used in a HRES for backup when renewable energy supply is not sufficient. While the HRES is very important due to the smallest natural and physical contact compared to non renewable sources, this work proposed a comparison outcome with the help of different component by using HOMER software and get best optimize result for the model. This paper presents a wide-ranging review of various aspects of HRES. This paper discusses study, best sizing, and model, organize aspect and reliability issue. Received Aug 29, 2017 Revised Jan 6, 2018 Accepted Jan 20, 2018 Keywords: Comparative analysis Configuration Resources Study area Copyright A 2019 Institute of Advanced Engineering and Science. All rights reserved. Corresponding Author: Shweta Goyal. Department of Electrical Engineering Graphic Era demmed to be University. Dehradun - 248002. Uttarakhand. India. Email: shwetugoyal@gmail. INTRODUCTION Electricity generation through renewable sources in a very important topic for research now days. the reduction of fossil fuels and the knowledge of ecological humiliation is the main reason for increasing use of renewable energy in todayAos scenario, to reduce the effect of green house gases it is very important to develop of a HRES system in rural area . Use of non renewable sources alone can be a very expensive process so to reduce the cost of electricity generation we can also use the renewable sources. They are cheap and easily available for generation. The main apparatus of the HES mainly is renewable power generator as a primary (AC/DC source. , non-renewable generator as a backup system(AC/DC source. , power conditioning unit, battery system, load (AC/DC) and sometimes it is grid connected while some time stand alone . A general HRES configuration has been shown in Figure 1. HOMER (Hybrid Optimization of Multiple Energy Resource. is the international set in small grid software, based on decades of listen to the desires of user in the order of the world with knowledge in designing and arrange small grids and transmitted power system that can contain a grouping of nonconventional energy sources, storage, and conventional generation either it is through a local generator or a power grid. Homer system used to reduce the dependency upon other conventional sources . It used to simplify the designing task of the hybrid model, and optimization and evaluation of the economical and scientific option of a highest amount of options like machinery expenses, electric load, and power supply accessibility whether stand alone and grid connected. HOMER basically designed for rural community electrification and now it is licensed to HOMER Energy. Objective Oriented Project Plannin. of a hybrid renewable energy system can be used to develop a novel approach of optimization . Journal homepage: http://iaescore. com/journals/index. php/IJECE A ISSN: 2088-8708 Figure 1. Hybrid energy system component STUDY AREA Either the government companies are not able to set positive infrastructure for electricity in hilly areas of Uttarakhand because of transportation difficulties. RTI query by Dehradun-based activist Ajay Kumar reveals this information through investigation. that More than 76 villages of Uttarakhand are not electrified yet . Amazingly, two district of Uttrakhand. Uttarkashi and Pithoragarh divide global border with Nepal and China, have a mass of village unelectrified. The current reading projected stand alone hybrid energy system consisting of biomass, solar photovoltaic, diesel generator, and battery. Table 1 shows the particulars of cluster of Dehradun block . Table 1. Number of Villages Targeted for Electrification/Intensive Electrification under DDUGJY (Deen Dyal Upadhyay Gram Jyoti Yojn. Block Chakrata Doiwala Kalsi Raipur Sahaspur Vikas Nagar TOTAL OF ALL BLOCKS No. of Unelectrified & Deelectrified Village No. of Electrified Villages Perviously Total LOAD ASSESSMENT Dehradun block has adequate sunshine as a natural resource. it has moderate wind speeds while biomass available in great quantity as the animal population is much greater in this area and other parts of Data collected by the survey and the demand of energy is separated into five main category . domestic load . commercial load . agriculture/irrigation load . school load . medical centers. Domestic load consists of light, television set, fans, and radio system. Commercial load include power for shops, community centre, street lights while agriculture load includes water pump, irrigation pump, well, fodder machine. Medical centre load consist. CFL, refrigerator, fans, while school load consist of CFL, ceiling fan, desktop, television Table 2 shows types of load for different section. In this section year is divided into two segment of 6-6 month namely summer and winter from May to October and November to April respectively. Different load profiles shown in Figure 2. Figure 3 and Figure 4. shows combined yearly load assessment for given area. Table 2. Different Categories of Load for Each Time Segment Load Power. Domestic Purpose Includes :Low Energy Lights(CFL)/Television/Fan/Immersion Rod Total Business Load Includes :Shops/Community Centre/Street Light Total Agriculture/Irrigation Purpose Includes :Water Pump/Irrigation Pump/Well/Fodder Machine Total Medical Centre Include :Low Energy Lights. /Ceiling Fan/ Refrigrator Total School Load Includes: CFL/Ceiling Fan/Desktop. /Television Total Int J Elec & Comp Eng. Vol. No. February 2019 : 141 - 147 Summer Time (May-oc. Watt-hrs/Day Winter Time (November-Apri. Watt-hrs/Day Int J Elec & Comp Eng ISSN: 2088-8708 Figure 2. Winter period load profile Figure 3. Summer period load profile Figure 4. Combined load profile RESOURCES ASSESMENT In this area, solar and biomass are the major resources. The estimation of potential of available energy resources as well as the energy demand of the study area is carried out as follows: Photo voltaic system The wealth is used for 50 KW system is $37,500 and replacement cost is taken $11,693. 50, 100, 200 kW used as the different capacities for Solar PV panels. And system life is considered 20 years . Table 3 shows the PV input data used in HOMER and Figure 5 shows the graphical representation of that Table 3. A comparative approach between different optimize result in hybrid energy systemA (Shweta Goya. A ISSN: 2088-8708 Table3. Solar Resource Input in HOMER Month January February March April May June July August September October November December Average Clear index Daily radiation . Wh/m2/. Figure 5. Solar input graph Biomass energy The estimation of Biomass probably depends on the accessibility of animal and agriculture waist. The availability of biomass on the site about 14t/day. Table 4 shows the biomass data in that area. Some biomass used for domestic purpose and balance is obtainable for power generation using biomass gasification . Table 4. Biomass Resource Input Month January February March April May June July August September October November December Average Available biomass. ones/da. Diesel engine-generator set A generator of 3 kW AC is used at cost $338 initially and replacement cost $576 is considered with $ 0. 38 per hour process and preservation charges. Its time is predictable as 15000 working hours. Different capacities of ac generators are considered, for e. 15 kW, 20 kW for optimization. Algorithm Figure 6 defines the algorithm work for this research work and Costs of various apparatus are given in Table 5. Table 5. Cost of Various Components Component PV cell Biomass generator Diesel generator Convertor Battery Cost ($/KW) This proposed model prepare with the help of one 50 kW photovoltaic cell, one 200 kW bio diesel generator, one 1 kwconverter, 1 S4KS25P battery, one 3 kW diesel generator . or backup syste. with 3mwh/day and peak load is 645 kW shown in Figure 7. Int J Elec & Comp Eng. Vol. No. February 2019 : 141 - 147 Int J Elec & Comp Eng ISSN: 2088-8708 Figure 6. Algorithm frame work Figure 7. Final model of HRES DIFFERENT CONFIGURATION OF PROPOSED MODEL We get different configuration with different component result which is shown in Table 6. But the best result configuration get is I model. Table 6. Four Different Configurations with Different Component System Component Solar Photovoltaic Biodiesel Battery Generator I Model Yes Yes Yes Yes Availability II Model i Model Yes Yes Yes Yes Yes IV Model Yes Yes Yes A comparative approach between different optimize result in hybrid energy systemA (Shweta Goya. A ISSN: 2088-8708 It is seen that when using all four component then NPC (Net Present Cos. of $270,146 and COE (Cost of Energ. $0. 024/kWh which is best configuration with moderate production. Table 7 shows the electricity production by different apparatus from I configuration. Table 8 shows the comparative study between different configurations in homer with step time 50 and optimized completed in 1. 34 min. Table 7. Power Generation by Different Apparatus Production PV array Generator 1 Generator 10 Total KW/yr 114,863 7,474 973,728 1,096,065 Table 8. Comparative Study between Different Configurations Configurations SPV ,biodiesel with battery and diesel generator SPV, biodiesel without battery and diesel SPV, biodiesel with battery without diesel SPV, biodiesel with diesel generator without Total energy production KWh/yr 1,096,065 1,170,408 NPC($) COE($)/KWh 270,146 241,074 Operating cost($)/yr 3,141 1,089,155 242,034 1,177,575 269,228 3,148 COMPARATIVE ANALYSIS AND DISCUSSION The job had been done on HRES for Dehradun Block using solar/ biogas/ diesel/ battery/converter apparatus and found the best suited hybrid model for the selected block, by which we can found the lowest NPC. COE. Operating cost. The optimization and simulation shows that on the base of reasonable COE and NPC, i. with the entire four components we get best alternative but meet maximum consistency. I model has the maximum renewable incursion II model consists of SPV/ biogas but no diesel/ battery has lowest NPC. But there is no back up in the If somehow any renewable source are not present than we will not able to get electricity. With the comparison of model 1 it reduce the initial cost But meet higher COE and NPC. In i model without diesel generator has same problem as II model In IV model without battery does not have any storage system for excessive battery. Which will increase operating cost so NPC and COE also increase REFERENCES