Int. Journal of Renewable Energy Development 8 . 2019: 293-301 P a g e . Contents list available at IJRED website Int. Journal of Renewable Energy Development (IJRED) Journal homepage: http://ejournal. id/index. php/ijred Research Article Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq Olusola Bamisilea*. Foyin Olubiyob. Mustafa Dagbasic. Humphrey Adunc and Ifeoluwa Wole-Oshoc School of Mechanical and Electrical Engineering. University of Electronic Science and Technology of China. Chengdu. Sichuan P. China. Engineering Management Department. Cyprus International University. Haspolat-Lefkosa. Mersin 10. Turkey. Energy Systems Engineering Department. Cyprus International University. Haspolat-Lefkosa. Mersin 10. Turkey. ABSTRACT. In this study, photovoltaic (PV) technology development over the years is reviewed. The use of PV power plants to solve inadequate power supply in Kurdistan is also analysed. PV power application is one of the most developed renewable energy applications but still not commercialized in somw countries. In this paper, three different locations will be evaluated in Kurdistan for PV plant The research will investigate the best location for PV plant installation in Kurdistan, check the viability of the proposed plants and compare the performance of a fixed and a double axis tracking system. A 10 MW PV plant is developed and simulated based on economic terms. The results from the analysis shows that the simple payback period for a 10 MW PV plant in all the locations considered is between 6. 8 and 7. 2 years. Also, the installation with two-axis tracking system gave the lowest simple payback period . The PV plant is viable considering other economic indicators like. IRR. NPV, annual life cycle savings and BCR. The yearly savings of the system for one of the locations considered is US$1,573,327 with a dual axis tracking system. A2019. CBIORE-IJRED. All rights Keywords: Economic Analysis. Electricity. Energy. Kurdistan. Photovoltaics Article History: Received: April 6, 2019. Revised: Sept 7, 2019. Accepted: Oct 2, 2019. Available online: Oct 30, 2019 How to Cite This Article: Bamisile. Olubiyo. Dagbasi. Adun. and Wole-Osho. Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. International Journal of Renewable Energy Development, 8. , 293-301 https://doi. org/10. 14710/ijred. Introduction Kurdistan region also known as Northern Iraq consist of three governorates. Erbil. Sulaymani, and Duhok. It also represents about 17% of total republic of Iraq with a land space of 73,618 km2 (Rashid 2. The average daily solar energy potential for this region is 4. 81 kWh/mA/day and the yearly solar energy potential is estimated to be 83 MJ/m2/yr (Abdul-Wahid. Mahdy, and Godu 2. According to the Ministry of Planning there was a 579 MW shortage in power supply in 2012. Almost 82% of the total power demand in northern Iraq is provided by the government (Government 2. The demand increases day by day, especially after the displacement of people, due to ISIS crisis in 2014. Although electricity production has increased over the years in Kurdistan, the consumer demands are yet to be met. Recently, the country had a grid-based transmission deficit of 7GW (Al-Karaghouli and Kazmerski 2. Generator devices are the main supplement for electricity shortage in this region with about 90% of residential consumers using an estimated 3 TWh/yr from these devices. The cost implications of generators are 10 to 15 times more than the electricity obtained from the grid (IEA 2. Demand for electricity is at its peak in summer with about 50% increase in average demand thereby causing an increase in electricity demand-supply gap (Kazem. Chaichan, and Kazem 2. The advantages of PV technology include: reduction in petrol and natural gas usage for electricity generation, reduction in carbon dioxide emission and global warming Development of more efficient PV panels, and the overall market share of PV technology has reduced its installation cost (Grover 2. Nowadays, the efficiency of most commercial PV panels ranges from 15% and 20% (Kazem. Chaichan, and Kazem 2. The disadvantages associated with the use of solar technologies includes. chemical effects of their material, effect on the aesthetic value in the buildings, degradation of lands etc. (Abolhosseini. Heshmati. Altmann 2. Literature has shown that one of the biggest problems of PV installations is the settlement of dust on solar panels. In a study carried out in Saudi Arabia (A. , it was concluded through experiments that there is as much as 11. 5% decrease in the power production of a Corresponding author: boomfem@gmail. A IJRED Ae ISSN: 2252-4940. All rights reserved Citation: Bamisile. Olubiyo. Dagbasi. Adun. and Wole-Osho. Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. Int. Journal of Renewable Energy Development, 8. ,293-301, doi. org/10. 14710/ijred. P a g e | 294 PV installation. A comparative study of a small-scale solar PV power plant was carried out in Saudi Arabia (Rashwan. Shaaban, and Al-Suliman 2. The new electricity tariffs . 0 and 8. 0 cents/kWh for governmental and commercial sectors respectivel. is used. The equity PBP were found to be 8. 2 and 14. 1 years for the scenarios considered and the reduction in equity PBP is 41% when the electricity tariff is doubled. About 70 tCO2 is saved with this project. The third scenario considered the use of grid electricity . %) and PV . %). While the equity PBP increased to 21. 7 years, 23 tCO2 is saved. A recent study in Tabass-Iran worked on optimum tilt and decline (Khorasanizadeh. Mohammadi, and Mostafaeipour 2. The optimum tilt, monthly varies in June/July between 0A and 64A in December. The yearly optimum tilt was concluded to be 33. 32A and 10A tilt angles were The performance of a 200KWp grid connected PV system in the optimal inclination and orientation suggested Koya city has the best performance (Abdulrahman. Abdullah, and Danial 2. The study concluded that the yearly average energy is 5. kWh/m2/day, and by installing PV Panels optimally, this 79 KWh/m2/day. Kurdistan region is one of the most peaceful developed regions in the country. nevertheless, the region is faced with serious electricity challenge. Currently, this region has inadequate power supply and rural areas have little or no access to electricity. Also, there is no grid connected or standalone large-scale PV plants in this region. In this research the use of a 10 MW PV plant to generate electricity in Kurdistan region will be analysed. The economic benefits of this installation and its viability is the main aim of this study. This research will evaluate the use of PV plants in the Kurdistan as an alternative to fossil fuel for electricity generation. The researchAos significance is embedded in the evaluation of a sustainable and renewable source of energy and its viability in this The research will also give a better understanding about the potential of photovoltaic plant as a means of solving power shortage problem. A detailed performance and economic analysis of PV plant installations in this region will be done. Fixed and double axis PV plant technology will be considered. This write-up is divided into five sections. With a brief introduction in this section, section two reviews the development of PV plants over the Section three give the details of the research methodology and all the parameters used for the simulation are defined. The results and conclusions from this study are given in section four and five respectively. PV Plant Development Over the Years PV plant development has evolved over the years with recent studies focusing on optimal performance, casestudy, hybrid and cost analysis of PV applications. Sayedus et al . used HOMER and RETScreen to propose a model for assessing RE systems . ith focus on power systems providing electricit. (Salehin et al. The optimized system sizing based on the results from HOMER comprised of 51 kW of wind turbine, 62 kW of PV arrays and 9 kW Diesel generator for both (Wind and PV) The Equity PBP, initial cost. GHG emission reduction for Wind-diesel and Solar PV-Diesel energy systems are 11. 2 years, $347,859, 42. 9t CO2 and 5. 4 years, $234,267, 54. 3t CO2 respectively. Dihrab and Sopian . , studied the electricity generation using a solar/wind hybrid system in three cities in Iraq (Dihrab and Sopian 2. Results from the modelling showed that solar and wind hybrid system is an effective system for electricity generation in rural areas of Iraq. Bousetta et. , considered the pre-viability of a hybrid microgrid system in Morocco. Their results showed that coupling PV panels and wind turbines is the optimal solution for all studied areas with the exception of those in the east which are characterized by low average wind speed during the year (Boussetta et al. Techno-economic modelling of PV systems help in the exploration PV potential. Al-Karaghouli, and Kazmerski . , analyzed the economic and technical feasibility of installing PV plant in a clinic in the rural part of Iraq. The calculation showed that the optimal system cost was US$ 50,700, while the net present cost and electricity cost were US$ 60,375, and US$ 0. 238/kW h respectively (AlKaraghouli and Kazmerski 2. This is efficient in terms of technical and economic analysis. Akinyele . , presents the techno-economic design and performance analysis of a nanogrid system. The analysis was done on five neighbouring houses, in Gwagwalada-Abuja. Nigeria. The possibility of using different energy configurations . olar nanogrid (SN. , diesel nanogrid (DN. , solar/diesel nanogrid (SDN. , solar/wind nanogrid (SWN. and solar/wind/diesel nanogrid (SWDN. were Results reveal that 5Ae14. 5 kW SNg can meet the usersAo demand of 12. 5Ae36. 5 kWh/d (D. Akinyele 2. The techno-economic feasibility of installing a wind/PV hybrid system in a village in Saudi Arabia was considered in another study (Rehman et al. The energy requirement of the village was 17,043. 4 MWh/yr of AC primary load, of which the wind-PV-diesel hybrid was able to meet, 4. 1% energy in excess. The wind turbines contributed 4713 MWh annually, while the solar PV added 5MWh. Furthermore. Patil et al. , . , compared the technical and economic feasibility of solar PV systems with battery storage at a capacity of 50 kWe, solar thermal energy storage (TES) and solar organic Rankine cycle . ORC). Five performance indicators namely. capital cost, levelized cost of electricity (LCEO), capacity utilization factor (CUF) and energy wasted, were used to check the feasibility of the systems. The results indicate that in order to achieve minimum LCOE, the operational zones of the two technologies should differ in terms of storage requirement (Patil et al. An economic feasibility study in Chile about residential and commercial PV technology showed that the country has a good solar potential (Ram?rez-Sagner et al. The internal rate of return (IRR) for all the locations considered are higher than 5%/yr. A retrofit techno-economic analysis of Canadian buildings with PV and BIPV/T . uilding integrated photovoltaic/therma. was studied in (Asaee et The study predicts the GHG emission reduction, tolerable capital costs and energy savings for regions across Canada. BIPV/T system retrofit yields 17% GHG emission reduction and 18% energy savings, while PV system yields 5% GHG emission reduction and 3% energy Another study proposed a small . 15 kW) off-grid solar photovoltaic power generation for communities. A IJRED Ae ISSN: 2252-4940. All rights reserved Int. Journal of Renewable Energy Development 8 . 2019: 293-301 P a g e . Environmental analysis, life cycle emission and energy analyses of the system were the focus of the research (Akinyele 2. Using the system is feasible with an energy payback period of 5. 7 years over a lifetime analysis of 25 years. Results from the study also showed that battery has a life cycle emission and energy impact due to its relatively short lifespan. Proposing an economical and optimized design for electricity generation using hybrid energy source PV/Biomass for an agricultural farm and a residential community centred was the aim of one the studies (Shahzad et al. This analysis compares the performance of the system and shows that system is techno economically viable based on the net present cost and cost of energy. In another study by Ruifeng et al . , a yearlong performance analysis was done on PV system in Brisbane (Queensland. Australi. The data was collected between 1st of July 2011 and 30th of June 2012 with 17 sets of 56 tilted . 5o Nort. panels and another 4 sets of 60 tilted . The result from the field measurements validates the theoretical models and the study also provide valuable information/tools for Australian PV industries and installations (Yan et al. A study assessed the economic feasibility of the solar PV systems at a campus in New England. The analysis was done based by using actual data from the solar array on campus (Lee et al. The average payback period of a campus-wide PV system was calculated as primarily 11 years, and was estimated to reduce overall building operating expenses by Normazlina et al. , assessed the feasibility of a cogeneration system for a hospital building in Malaysia (Isa et al. This system consists of a grid connected photovoltaic (PV), battery and fuel cell. The economic parameters used in checking the feasibility of the model renewable fraction, levelized cost of energy (LCOE), total net present cost (TNPC), carbon emission and excess energy production. The simulation result showed that the proposed cogeneration system has the lowest TNPC. LCOE and operating cost which are $ 106,551, 0. 091 $/kWh and 7245 $/yr respectively. Table 1 Comparison of Solar Irradiance in the three cities Month Fixed axis daily solar radiation Horizontal . Wh/m2/. Two axis daily solar radiation Horizontal . Wh/m2/. January AsSulaymaniy February March April May June July August September October 6,16 November December Annual average Annual total export (MW. 16,987. 16,726. 16,948 22,777 22,454 22,758 Erbil Kirkuk AsSulaymaniyah Erbil Kirkuk Other researches that worked on techno-economic analysis and feasibility of PV plants and other system are (Brown et al. Cai et al. Freeman et al. Kassem. Al-Haddad, and Komljenovic 2017. Li et al. Rehman et al. Uris. Linares, and Arenas 2. all these studies, none worked on Kurdistan region of Iraq in particular, the closest study to this research is a feasibility study of a 10 MW PV power plants in Saudi Arabia (Rehman et al. The economic feasibility of this project is checked for 44 different sites in the country. Unlike the present study, this research is grid connected and RETScreen software is used for the analysis. The best equity IRR and PBP from all the sites considered is 9. 6 years. This research will provide insight into the profitability of investing in Kurdistan and this can used as template in countries with similar weather data and economic status. This research also provides necessary information for researchers in techno-economic field. Methodology The necessity for more electricity in Kurdistan region of Iraq has been established in section one. Beyond tackling electricity shortage problems, economic viability of a PV power project is important. This will attract investors, reduce carbon emission and tackle power shortage problem. In this research, a 10 MW PV plant will be designed and simulated based on financial parameters for Kurdistan. Three different locations namely. Erbil. A IJRED Ae ISSN: 2252-4940. All rights reserved Citation: Bamisile. Olubiyo. Dagbasi. Adun. and Wole-Osho. Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. Int. Journal of Renewable Energy Development, 8. ,293-301, doi. org/10. 14710/ijred. P a g e | 296 Kirkuk and As-sulaymmaniyah will be considered. The economic indicators upon which this feasibility and viability measurements are based includes. Simple Payback Period (SPP). Net Present Value (NPV). Internal Rate of Return (IRR), annual life cycle savings, benefitcost ratio and Energy Production Costs. One of the most widely used renewable energy program (RETScree. is used for the economic analysis. This energy program predicts the economic benefits of using a particular renewable energy for power production based on the input It should be noted that energy storage is not considered for this research as the proposed PV plant is intended to be grid connected. 1 System Design Choosing the right site for a PV plant installation will have a robust effect on its energy production. Also, for simulation purpose, meteorological data availability is very important as it helps to predict the system The three cities in this research are selected based on data availability on the NASA database incorporated by the software developer. These locations are Erbil. Kirkuk and As-sulaymaniyah. The coordinate for these locations respectively is 36A11A28AN 44A0A33AE for Erbil, 35A28A0AN 44A119A0AE Kirkuk 35A33A26AN 45A26A08AE for As-sulaymaniyah. It is also important to select the most appropriate slope and azimuth angle to harvest more solar radiation. The azimuth and slope angle for the different locations respectively are 0 and 28 degrees for Erbil, 0 and 30 degrees for Kirkuk and 0 and 28 degrees for Assulaymaniyah. The three locations are characterised with semi-arid climates. Table 2 PV module specifications Item Specification Item Specification Manufacturer PV module type/ model Practical Efficiency China Sunergy Mono-Si - CSUN200-48M Anodized aluminum profile Module Efficiency PV Module Rating/ Rated Power Voltage [@Peak Powe. Current[@PeakPowe. Open circuit Voltage. Short circuit current Frame Mounting dimensions and Width and Length Weight Standard Operating Conditions (SOC) Operating Temperature Operating Relative Humidity. 990mmy1956 mm 8 kg 1000 W/m2. AM 1. 5, 25 AC -40 AC to 85 AC 40% to 95 % Source: (CSun-Solar 2. A summary of the solar radiation data for fixed axis and double axis system is given in Table 1. In this research, a 200W peak capacity China Sunergy mono-Si-CSUN20048M is used in the model design. The panel is common in the market with a practical efficiency is 17. 2 % and a module efficiency of 15% (Table . The inverters used for this study has an efficiency of 95% and the capacity is 13,000kW (Abbasoglu. Nakipoglu, and Kelesoglu 2011. Chandel et al. The PV panel is chosen based on the data availability on the simulation software (RetScree. for this study. The full specifications of the PV-module use in this research is stated in Table 2. 1 Economic Parameters The initial costs of the installation, which consists of PV/inverter costs, feasibility studies cost, development cost, balance of system components cost, periodic costs, engineering costs etc. are all required as input In this research, the financial parameters for the fixed axis and dual axis systems are calculated The initial cost that includes development cost, feasibility and engineering cost are US$15,184,000 and US$19,578,000 for fixed and two-axis respectively. Operation and maintenance (O&M) cost is an important economic parameter to consider and for this study, the O&M for fixed and dual axis system are US$77,000 and US$98,000 respectively (Abbasoglu. Nakipoglu, and Kelesoglu 2. A 3. 2% miscellaneous loss is assumed for this simulation based on information from literature (Shiva Kumar and Sudhakar 2. The energy export rate is 130 $/MWh in Iraq currently (No Title n. It is paramount to note that in this research, installation subsidy, feed-in tariff, net metering and other related PV economic policies are not considered as none is in existence in Kurdistan. The main economics parameters used in research are highlighted in table 3 and table 4. Table 3 Initial and Periodic Costs of PV Plant Cost Item Description Initial Cost Item. Feasibility Study. Development. Engineering. Transmission line Power system and other components Periodic Cost Item. Annual O&M Cost (Annua. Fixed US$1,500 US$2,000 US$10,000 US$1,000 US$15,169,500 Two-Axis US$1,500 US$4,000 US$10,000 US$1,000 US$19,561,500 Fixed 75,000$ Two-Axis 96,000$ Table 4 Other Parameters Parameters Description Inflation Rate Project Life Corporate income tax Interest rate Fuel Cost A IJRED Ae ISSN: 2252-4940. All rights reserved Values 51 $/litres Int. Journal of Renewable Energy Development 8 . 2019: 293-301 P a g e . Results and Discussions In this research, a 10 MW PV plant is simulated based on economic parameters in order to determine its feasibility in Kurdistan region of Iraq. RETScreen simulation program was used for the analysis and the feasibility will be determined based on the economic Retscreen program uses the meteorological data of a location to calculate the performance of PV plant. This program considers the effects of ambient temperature and wind on the PV plant performance but does not consider the effect of dust. The PV panel nominal operating cell temperature is also considered as it affects the efficiency of the PV plant. The results presented in this section will be discussed under three sub-sections. The first subsection gives the cash inflow and the energy production from different location while a comparative study of economic indicators like NPV. IRR. SPP etc. are given in sub-section two. Sub-section three will give the benefit of the system to the environments and the greenhouse gas 1 Techno-Economic Feasibility The proposed PV plant nominal capacity for all the three locations are the same, hence the land requirement. However, the land requirements for the fixed panels is less compared to the panels with two axis tracking system. 65,317m2 and 70,621m2 respectively. The electricity production annually using fixed and two-axis tracking systems respectively for all the locations are. 16,978. MWh and 22,777 MWh for As-sulaymaniyah, 16,726. MWh and 22,454 MWh for Erbil and 16,948 MWh and 22,758 MWh for Kirkuk. The capacity factors for fixed and dual tracking system in the three locations respectively 4% and 26% for As-sulaymaniyah, 19 % and 25. for Erbil and 19. 3% and 26% for Kirkuk. Other production details including the revenue generated yearly for the three location are given in Table 5. 2 Comparative Economic Feasibility One of the main objectives of this research is to compare the PV performance and economic viability for the three different locations. In this subsection, the performance and economic feasibility of the three cities considered will be compared. In comparison. Assulaymaniyah PV plant simulation result had the best electricity produce. This is in agreement with the meteorological data in table 1. Kirkuk have the secondbest production while Erbil has the least production. The details of the annual electricity production and the life span electricity production is given in table 5 and figure 1. Table 5 Techno-Economic Results Land Requirement Capacity Factor Annual Electricity Production Life Span Electricity Production Annual Revenue As-sulaymaniyah 65,317m2 70,621m2 16,978. 3 MWh 22,777 MWh 424,457. 5 MWh 569,425 MWh 2,207,178 US$/yr 2,2961,003 US$/yr Fixed Dual Axis Fixed Dual Axis Fixed Dual Axis Fixed Dual Axis Fixed Dual Axis Locations Erbil 65,317m2 70,621m2 16,726. 8 MWh 22,454 MWh 418,170 MWh 561,350 MWh 2,174,487 US$/yr 2,919,002 US$/yr Kirkuk 65,317m2 70,621m2 16,948 MWh 22,758 MWh 423,700 MWh 568,950 MWh 2,203,299 US$/yr 2,958,558 US$/yr Electricity Exported to the Grid (MW. 000,00 000,00 000,00 000,00 000,00 0,00 As-sulaymaniyah Erbil Kirkuk Fixed-axis 978,30 726,80 Two-axis Fig. 1 Comparative chat of electricity exportation 1 Payback Period Payback period is an indication of the period a project is expected to recoup its initial investment. It utilizes the cash it generates which is calculated using the total initial costs, total annual savings and the total annual costs . ut excluding all debt payment. The basic criteria for A IJRED Ae ISSN: 2252-4940. All rights reserved Citation: Bamisile. Olubiyo. Dagbasi. Adun. and Wole-Osho. Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. Int. Journal of Renewable Energy Development, 8. ,293-301, doi. org/10. 14710/ijred. P a g e | 298 14,20 14,00 14,20 Kirkuk 11,80 11,50 11,70 7,1 7,2 7,1 Erbil Erbil 11,20 11,00 11,20 As-sulaymaniyah 8,3 8,5 8,4 As-sulaymaniyah 13,60 13,30 13,50 concluding on payback period is that the smaller the payback period, the more desirable the project for (Abbasoglu. Nakipoglu, and Kelesoglu 2. this research both the equity payback and simple payback period are considered. The simple payback for fixed/two axis system in the three locations respectively are 7. 1/6. years for As-sulaymaniyah, 7. 2/6. 8 years for Kirkuk and Erbil. The equity payback period is between 8. 3 and 8. for fixed axis and between 8 and 8. 1 years for two-axis PV system (Fig. FIXED TWO-AXIS Kirkuk 8 8,1 8 FIXED 6,8 6,9 6,8 TWO-AXIS PRE-TAX EQUITY/ASSEST AFTER-TAX EQUITY/ASSEST Fixed Two-axis Two-axis Fixed Equity Payback Simple Payback Equity Payback Simple Payback Fig. 3 Pre-tax IRR and After-tax IRR Equity/Assets(%) Fig. 2 Comparative chat of Payback Periods (Year. 2 Internal Rate of Return (IRR) IRR is the interest generated i. the time adjusted rate of return by the Project equity over the life of the project. ItAos calculated by checking the discount rate that would make the net present value of a project amount to zero. project with an IRR is greater or equal to the discount rate is said to be viable. The Solar PV plant installation considered in this research is feasible for all the locations (Fig. considering the pre-tax and after-tax IRR values for fixed or two axis systems. Fixe Two -axis As-sulaymaniyah Erbil Kirkuk Fig. 41 Comparative chat for the Net Present Values 3 Net Present Value (NPV) An investment with a positive NPV will be a profitable Also, the higher NPV of a project the higher benefits. NPV presents the worth of a project considering all the future cash flows that is discounted at the discount rate. NPV is a measurement of cumulative profit calculated by subtracting the present values of cash outflows . ncluding initial cos. from the present values of cash inflows over the PV installation life time. NPV can either involved a single investment or a competing investment project. For all the cities considered in this study, the NPVs are greater than zero. This is an indication that the project is feasible for all the locations. Although the difference between As-sulaymaniyah and Kirkuk is not that much in terms of NPV. As-sulaymaniyah still has the greatest NPV and Erbil has the lowest (Fig. 4 Other Financial Parameters Other financial parameters like energy production cost (Fig. , annual life cycle saving . and benefitcost ratio (Fig. are considered for this study. Benefitcost Ratio (B-C) is an economical ratio that consists of the net benefits to costs of the project. The energy production cost. B-C ratio, and annual life cycle savings for all the cities considered in this research shows that the project is The energy production cost for the three locations ranges from 49. 74 US$/MWh and 52. 56 US$/MWh for both two-axis and fixed systems. The lower the energy production cost of a system, the more feasible the project. Other economic analysis results are given in Table 7. A IJRED Ae ISSN: 2252-4940. All rights reserved Int. Journal of Renewable Energy Development 8 . 2019: 293-301 P a g e . Fixed Two-axis Table 6 Other Economic Analysis Results Annual life cycle savings (US$/y. Locations As-slaymaniyah Erbil Kirkuk Fixed 1,142,950 1,114,813 1,139,611 Two-axis 1,573,327 1,537,177 1,571,223 Energy Production cost (US$/MW. Locations As-slaymaniyah Erbil Kirkuk Fixed Two-axis Locations As-slaymaniyah Erbil Kirkuk Fixed Two-axis Benefit-Cost Ratio As-slaymaniyah Erbil Kirkuk Fig. 5 Annual Life Cycle Savings Analysis Result 3 Fuels/Greenhouse Gas Emission Saving Fixed Two-axis 52,56 51,88 51,679 49,74 49,49 As-slaymaniyah Erbil Kirkuk Two-axis 2,77 Fixed 2,62 2,65 2,66 2,73 2,77 Fig. 6 Energy Production Cost (US$/MW. Analysis Result AS-SLAYMANIYAH ERBIL KIRKUK Fig. 7 Benefit-Cost Ratio Analysis Result (%) One main advantage of renewable energy over fossil fuels is the reduction in Green House Gas (GHG) emission. These GHGs include. carbon dioxide (CO. , nitrous oxide (N2O), methane (CH. , ozone (O. and several classes of halo carbons. The most relevant GHGs to energy projectsAo analysis are methane (CH. , carbon dioxide (CO. and nitrous oxide N2O. These gases were considered in GHG emission reduction analysis. The yearly GHG emission savings . n tCO. for fixed systems for As-sulaymaniyah. Erbil and Kirkuk are 17,027, 16,774 and 16,997 Using a two-axis tracking system increases these values (Table . The fuel oil saving for each of the locations and tracking systems are well over 1,000,000 litres annually (Table . This fuel saving is also calculated in terms of the equivalent cars and light trucks that will not be used yearly and the result is shown in Table 7. Conclusions In this research, the use of a renewable energy source to meet electricity demand was evaluated economically. 10 MW PV plant was designed and simulated for three different locations in Kurdistan. Iraq. RETScreen software was used for the simulation and analysis. This section presents the conclusion from the analysis of this systems based on economic terms like NPV. IRR, payback period and other economic parameters. Installing a 10 MW PV plant in all the three locations (As-sulaymaniyah. Erbil. Kirku. considered is generally feasible. The simple payback period for this installation in all the locations considered ranges from 6. 8 years to 7. 2 year. The payback period is quite high in comparison to similar installations in developed countries that are achieving simple payback periods of 3 years or less. The relatively high payback period is due to the low electricity tariff for Iraq . $/MW. and the absence of PV plant incentives. Installing a PV plant with two-axis tracking system gave the lowest simple payback period . 8 year. Considering other economic indicators. IRR. NPV, annual life cycle savings and BCR, the project is highly The NPV for all the cases considered indicates that the project . are viable. Installing a two-axis 10 MW PV plant in As-sulaymaniyah will save as much as A IJRED Ae ISSN: 2252-4940. All rights reserved Citation: Bamisile. Olubiyo. Dagbasi. Adun. and Wole-Osho. Economic Analysis and Performance of PV Plants: An Application in Kurdistan Region of Iraq. Int. Journal of Renewable Energy Development, 8. ,293-301, doi. org/10. 14710/ijred. P a g e | 300 US$1,573,327 per year. In terms of benefit cost ratio. Kirkuk and As-sulaymaniyah gives the best result . among the three sites considered. The energy production cost for PV plant is in all the three locations considered in this research is between 51. 68 $/MWh and 52. 56 $/MWh (Fig. This is far cheaper than the current electricity tariff of 130 $/MWh. Also, this is an indicator that the use of PV instead of Augenerator devicesAy in Kurdistan is economical feasible and viable. Generator devices are about 10 times higher than the current electricity tariff which is high than the PV plant energy production cost. This will also reduce the environmental concerns raised from the use of fossil fuels in Kurdistan. Using a two-axis tracking system is generally economically better than a fixed system. According to the meteorological data. Assulaymaniyah has the highest solar potential hence the best economic analysis results. Installing 10 to 20MWp PV plant with either fixed or two-axis system will solve part of the existing power problems in Kurdistan especially in rural areas. Table 7 Greenhouse Gases Savings Location GHG Savings GHG savings GHG saving per yr . CO. over 25 years . CO. Fossil Fuel Savings Fuel oil savings Equivalent of cars . & light trucks not used yearly Fuel Cost Using the fuel cost in dollars for Iraq . dollars/litr. As-sulaymaniyah . 17,027 425,661 1,520,508 3,118 775,459. As-sulaymaniyah . 22,842 571,039 2,039,852 4,184 1,040,324. Erbil . 16,774 419,357 1,498,029 3,072 763,994. Erbil . wo-axi. 22,518 562,939 2,010,925 4,124 1,025,571. Kirkuk . 16,997 424,913 1,517,821 3,113 774,088. Kirkuk . wo-axi. 22,823 570,567 2,038,150 4,180 1,039,456. Considering Iraq as a country that emits sizeable amount of greenhouse gases, implementing this project abate some considerable emissions into the atmosphere. Reduction of GHG emission is currently a global issue and all nations are trying to achieve. Installing a 10 MW PV plant in any of the three locations considered will save at least 419,357 tonnes of CO2 equivalence emission from the atmosphere. This will also increase energy security, sustainability and equity of the country thereby increasing its political status in global energy ranking. Finally, this study provides basics for other technoeconomic analysis about PV plant. Data and results from this research can be adopted in similar application. It will also serve as a bedrock research for PV plant application research in Kurdistan. Based on the analysis, results/discussions and conclusion of this research, the following are A Research should be done on the possibility of installing a PV system with a higher capacity. Analyzing and comparing the feasibility of other PV technologies like. solar PV-T and CPV should be done to determine the most suitable technology. The country of Iraq should introduce different renewable energy policies . eed-in-tariff and netmeterin. that will enhance/encourage PV References