INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree Analysis Ramli Mahaddin Hutajulu1. Dino Erivianto2. Muhammad Erpandi Dalimunthe3 Universitas Pembangunan Panca Budi. Medan. North Sumatera. Indonesia Article Info Keywords: Electrical Distribution Disturbances. Fault Tree Analysis. PLN ULP Balige. System Reliability, and Root Causes This is an open access article under the CC BY-NClicense ABSTRACT Disruptions in the electricity distribution network are one of the main problems that can reduce the reliability of electricity supply to PT PLN ULP Balige as a customer service unit has the responsibility to ensure the continuity and quality of electricity distribution services in its operational area. This study aims to analyze the main causes of electricity distribution network disruptions using the Fault Tree Analysis (FTA) method. This method is used to identify the root causes of disruptions with a deductive approach arranged in the form of a fault tree. The data used in this study were obtained from disruption reports over the past year that occurred in the medium and low voltage distribution network at PT PLN ULP Balige. The results of the analysis indicate that several dominant factors causing disruptions include equipment component damage . uch as transformers and cable. , weather disturbances, and other external factors. With FTA modeling, logical relationships between causes can be systematically mapped, thereby facilitating the evaluation process and technical decision-making. This study is expected to be a basis for PT PLN ULP Balige in formulating prevention strategies and improving the reliability of the electricity distribution system through a more structured analytical approach. Corresponding Author: Ramli Mahaddin Hutajulu Universitas Pembangunan Panca Budi. Medan. North Sumatera. Indonesia ramlimahaddinhutajulu@gmail. INTRODUCTION The electricity distribution system is a vital component in the supply of electricity from generating plants to end consumers. The reliability of the distribution system significantly impacts the continuity of a stable and high-quality electricity supply. However, in practice, disruptions to the distribution network still frequently occur, both technical in nature, such as equipment failures and extreme weather events, and non-technical ones, such as operational errors. These disruptions not only disrupt public and industrial activities but also cause economic losses and undermine customer trust in electricity providers. PT PLN ULP Balige, as the customer service unit responsible for electricity distribution in its area, faces challenges in quickly and accurately handling distribution network One of the main obstacles is the lack of a comprehensive and systematic root cause identification system. Therefore, an analytical approach capable of structurally analyzing the causes of disruptions is needed. Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1864 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum At the Balige UPL, disruptions frequently occur in the electrical distribution network. These disruptions are defined as energy losses, both technical and non-technical. This is evident in the significant difference between the electrical energy sent from the substation and that received by customers. One method that can be used to analyze the causes of system failures is Fault Tree Analysis (FTA). FTA is a deductive method that constructs a logical tree from a major failure event to its root causes, both technical and non-technical. By using FTA, companies can gain a deeper understanding of the source of the disruption, the cause-and-effect relationships between system components, and potential vulnerable points in the distribution network. This study aims to diagnose the root causes of disruptions in the electricity distribution network at PT PLN ULP Balige using the Fault Tree Analysis method. The results are expected to provide strategic recommendations for improving distribution system reliability and strengthening the system for preventing and handling disruptions in the future. Several factors suspected of causing distribution network disruptions include tree strikes, and disturbances often caused by lightning. Electrical energy sent from substations cannot reach customers due to network damage during the distribution process, causing the electrical power to be converted into heat energy. In addition to the loss of electrical energy, damage to the distribution network can also result in power outages. When power outages occur, potential revenue from customer electricity consumption is reduced. Literature Review Electric Power Distribution System. The electrical distribution system is the final component of the electrical power system, delivering electrical energy from substations to consumers. This system consists of medium- and low-voltage networks connected by various equipment such as distribution transformers, circuit breakers, cables, and household connections. The reliability of the distribution system is crucial because it directly impacts the continuity of service to Electric power distribution is the final stage of the electric power system, delivering electrical energy from the substation to the end consumer. This distribution system consists of primary and secondary distribution networks that generally operate at medium voltage . kV) and low voltage . /380 V) [Nasution, 2. Disruptions to the distribution network can cause outages, equipment damage, and reduced service quality to customers. Therefore, proper monitoring and analysis are necessary to identify the causes of disruptions and improve distribution system reliability. Distribution system disruptions can be caused by various factors, both technical and non-technical. Technical disruptions include equipment failure, short circuits, lightning strikes, and overloading. Non-technical disruptions can include human error, vandalism, or other external disturbances such as fallen trees. Identifying and analyzing the root causes of disruptions is crucial to improving system reliability. Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1865 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Electricity Delivery Process Due to various technical problems, electric power is only generated in certain places, while electricity users or electricity customers are spread across various places, so the delivery of electric power from the place of generation to the customer's location requires various technical handling. Electric power is generated in power centers such as hydroelectric power plants, then distributed through transmission lines after first increasing the voltage by a voltage-boosting transformer at the power center. High-voltage transmission lines in Indonesia have a voltage of 150 kV, known as high-voltage overhead lines (SUTT), and a voltage of 500 kV, known as extra-high-voltage overhead lines (SUTET). Transmission lines can be either overhead lines or underground Because overhead lines are much cheaper than underground cables, most transmission lines are overhead lines. The disadvantage of overhead transmission lines is the risk of natural disturbances such as heavy rain, lightning, and others. After the electricity is distributed through the transmission lines, it arrives at the main substation (GI) where its voltage is reduced through a step-down transformer to medium voltage, also known as primary distribution voltage. The primary distribution voltage currently used is 20 kV. The network after leaving the GI is called the distribution network, while the network between the power plant and the GI is called the transmission network. After the electric power is distributed through the primary distribution network, the voltage of the electric power is then reduced in the distribution substations to a low voltage of 380/220 Volts, then distributed through the low voltage network to be distributed to customer homes . through household connections. In practice, due to the vastness of the distribution network, many distribution transformers are required. Distribution substations are often simplified into pole transformers. Distribution System Delivery The voltage selection depends on the size of the supply area and the loading . oltage loss, conductor cross-sectio. as well as the voltage of the adjacent network, in low-voltage networks also on the permitted contact. The materials used for conductors are generally copper and aluminum, steel is only used for aluminum wire bones, so the type of conductor used is copper, aluminum or SCAC . teel cored aluminum conducto. The selection of the conductor cross-section is influenced by considerations, including the permissible cable load depending on the insulation's ability to withstand temperature increases, so at the conductor temperature and the surrounding air temperature, the permissible air duct load is limited by the reduction in mechanical strength when the temperature increases, the permissible voltage variation is A 5%. Large conductor cross-sections reduce losses but increase the cost. The optimum ratio between losses and wire cost provides an economical conductor cross-section. Conductors commonly used for distribution conductors include: The materials used in this type of conductor are copper, aluminum, steel, a combination of copper and steel, or a combination of aluminum and steel. Copper is the most widely used material for conductors because it is very good at conducting electric current, besides being quite cheap, it is also easy to connect. Aluminum is widely used Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1866 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum especially in high voltage networks, compared to copper wire with the same physical carving, aluminum wire has 60% conductivity, 45% tensile strength and 33% weight. obtain the same conductivity, the aluminum cross-section must be 1. 66 times larger than the copper wire cross-section. Aluminum wire with this size has 75% tensile strength and 55% weight of copper wire. To increase its tensile strength, aluminum wire is usually reinforced at the core, this type of wire is called aluminum conductor steel reinforced wire or ACSR . luminum conductor steel reinforce. The tensile strength of aluminum with the same current carrying capacity as copper wire is almost the same as the copper. Cables can be used for overhead lines and underground lines, cable installation can be done directly or inserted into pipes. Cables used for underground line systems must be resistant to unshielded moisture with a working voltage of 600 V widely used for secondary distribution networks, cables can consist of conductors and so on depending on the number of conductors that are isolated from each other in the sheath. Cable insulation can be made and various materials, paper is widely used for cables with a voltage of 600VAe35 KV. Polyethylene for 600 VAe138 KV, varnished cloth for 600 VAe 8 KV. Paper is used for higher voltages because of its low dielectric loss characteristics and low price. Almost every country has its own conductor size standards that are different from each other, but among the many conductor size standards, the most widely used is AWG (American Wire Gag. and the size is based on the cross-section in mm2. The AWG standard used in the United States is based on the code number 0000 for a diameter of 46 mci and number 36 for a diameter of 0. 005 inches, so the comparison between a diameter and an adjacent diameter with a difference of one code number is 1. For the conductor cross-section size in the United States, the "circular mil" . size is used where 1 cm = 5. 067 x 10-4 mm while the cross-section size with mm usually has a standard of 1. 50 and so on. Network disruption The distribution network is the part of the electric power system closest to the customer/consumer. In terms of physical volume, the distribution network is generally longer than the transmission network and the number of disturbances . certain number of times per 100 km per yea. is also higher compared to the number of disturbances on transmission lines. The distribution network, as is known, consists of a medium-voltage distribution network (JTM) and a low-voltage distribution network (JTR). The mediumvoltage distribution network has a voltage between 3 kV and 20 kV. Currently. PLN is only developing a 20 kV medium-voltage distribution network. The medium-voltage distribution network mostly consists of medium-voltage overhead lines and underground cables. Currently, disturbances on medium-voltage overhead lines can reach 100 times per 100 km per year. Most disturbances on medium-voltage overhead lines are not caused by lightning but by contact with trees, especially since many medium-voltage overhead lines are located in cities with tall buildings and trees taller than medium-voltage overhead line poles. This causes medium-voltage overhead lines in cities to be largely protected from lightning strikes but often disrupted by contact with trees. In areas outside the city, lightning strikes are also Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1867 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum common, in addition to tree contact. Both lightning and tree contact are temporary. therefore, using automatic reclosers will reduce supply interruption time. Types of disturbances in the distribution system include: Short circuit faults can occur between phases . phases or 2 phase. or 1 phase to ground and can be temporary or permanent in nature. Permanent faults: Short circuits in cables, transformer windings, generators . nsulation Temporary disturbances: Flash Over due to lightning strikes. Flash Over with trees, blown by wind. Overload faults occur when the distribution system is loaded beyond its installed These faults are not actually faults, but if allowed to persist, they can damage Overvoltage disturbances are among the most common disturbances on distribution Based on their cause, these overvoltage disturbances can be grouped into two Power Frequency Overvoltage. In distribution systems this is usually caused by an error in the AVR or tap regulator on the distribution transformer. Surge Overvoltage This disturbance is usually caused by a surge or lightning surge. Of these three types of faults, the short circuit fault is the most common and has the greatest impact on the distribution system. Therefore, the term "distribution system fault" generally refers to short circuit faults, and the protective equipment installed tends to mitigate these short circuit FTA . ault tree analysi. concept One analysis used to identify the cause of a failure is Fault Tree Analysis (FTA). This analytical approach prioritizes a "top-down" approach, starting at the overall system level and then working down to the specific component level. Because FTA falls under the category of systems analysis, it is important to understand it within the framework of systems analysis itself. A system is defined as a collection of entities that interact and work together to achieve a specific function. Analytical methods are used to analyze system System analysis can be simple or complex, but generally involves two categories of Questions Related to Cause. A cause is a condition that will lead to the occurrence of another event in the system. A cause is the initial event that must be analyzed thoroughly to prevent subsequent, undesirable events. An example of a question related to causes is what causes trains to collide. Questions Related to Consequences. An effect is a condition that will arise within a system due to a cause. Analysis is then conducted to determine what consequences will arise if the initial condition . Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1868 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum An example of a question related to causes is what would happen if a driver was drunk while driving. FTA is a deductive analysis method for identifying system failures by depicting alternative scenarios in a structured block diagram. Deductive analysis can be performed on all complex systems. The starting point of FTA analysis is identifying the failure mode at the top level of a A fault tree illustrates the state of system components . asic event. and the relationship between basic events and top events. The elements representing these relationships are called logic gates. From this fault tree diagram, cut sets and minimal cut sets can be constructed. A cut set is a series of system components whose failure can result in system failure. Meanwhile, a minimal cut set is the minimal set that can cause system FTA uses structured steps in analyzing a system. The FTA steps are: Identifying the most important events/incidents in the system . op-level event. This first step in FTA is crucial because it will influence the results of the system analysis. This stage requires an understanding of the system and knowledge of the types of failures . ndesired event. to identify the root cause of the system problem. Understanding the system is achieved by studying all information about the system and its scope. Fault tree. Once the most important issues are identified, the next step is to construct a causeand-effect fault tree. At this stage, a cause-and-effect diagram (Ishikawa diagra. can be used to analyze errors and explore the presence of hidden defects. The fault tree is constructed using Boolean symbols. Standardizing these symbols is necessary for communication and consistency within the fault tree. Analyzing fault trees. Fault tree analysis is necessary to obtain clear information about a system and what improvements need to be made to the system. The stages of fault tree analysis can be divided into three, namely: Simplifying the fault tree. The first step in fault tree analysis is to simplify the fault tree by eliminating branches with similar characteristics. The purpose of this simplification is to facilitate further system analysis. Determining the probability of the occurrence of the most important event or incident in the system . op-level even. After the fault tree is simplified, the next step is to determine the probability of the most important event in the system. this step, the probability of all inputs and logical relationships is used as a consideration in determining the probability. Reviewing the analysis results. Review of the analysis results is carried out to determine possible improvements that can be made to the system. The output obtained after conducting an FTA is the probability of the most important events occurring in the system and the root causes. These root causes are then used to Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1869 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum prioritize appropriate system repairs. Fault Tree Analysis (FTA) is a systematic analysis method used to identify and describe the potential causes of a failure or disruption in a FTA works deductively, starting with the top event and working down to the underlying causes . asic event. This process is structured in the form of a logic tree diagram using AND and OR gates. Some of the advantages of FTA are: Can show logical relationships between causes of failure Allows quantitative analysis of failure probability Widely used in high-risk engineering systems such as energy, nuclear, and aviation. FTA has been widely used in power system reliability analysis, particularly in detecting failure-prone points in distribution networks. By combining historical fault data and distribution system structure. FTA can be used to formulate more effective maintenance and fault prevention strategies. An enumeration graph illustrates how damage can occur, using Boolean symbols. This enumeration graph is a fault tree that will be analyzed based on the probability of each cause of the error. An enumeration graph is called a fault tree because its structure resembles a tree, converging on a single event and branching down into other event The symbols in an FTA can be divided into two categories: METHODOLOGY This research was conducted in the Customer Service Unit area to determine the condition and situation of the electricity distribution network system in the Balige Customer Service Unit. There are 2 types of data collected, namely primary data and secondary data. Primary data was conducted through interviews and direct observation from the Company. Secondary data was taken directly from PT. PLN Balige Customer Service Unit data. The secondary data include: Data on network disruptions in electricity distribution from January 2025 to June 2025. The data collection methods used in this study are as follows: Literature Methodis a data collection technique that involves examining various written sources relevant to the topic being researched. These sources can include books, scientific journals, academic articles, and even information from websites that support the discussion of the problem. Observation Methodis a data collection technique carried out by directly observing the disturbance conditions in the electricity distribution network to obtain accurate information regarding the problem. Discussion Methodis a data collection approach carried out through direct interviews with experts in the field of electricity, both final project supervisors in the field and sources at the research location. The data processing process carried out in this study is by using FTA (Fault Tree Analysi. The FTA stage aims to identify the basic events or combinations of events that cause damage to the distribution network. In this phase, a more in-depth analysis will be conducted to find the most significant root causes of problems with disruptions in the Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1870 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum electricity distribution network by utilizing FTA. The FTA method applies deductive analysis to explore the relationship between the causes and effects of an event in the system, and systematically considers all possible events (Event. and errors that can result in damage (Undesired Event. The stages of FTA are as follows: Identification of Undesired Events (Error. in the System This identification process aims to understand the problems that arise in the electrical distribution system, which can then be transformed into top-level events. The input for this stage is undesirable events in the electrical distribution system. From these events, one Undesired Event will be selected to become a Top-Level Event that can be clearly defined, observed, and measured. Fault Tree Creation A fault tree diagram is constructed using Boolean symbols, including event symbols and symbols indicating the relationships between events that can cause a disruption. This diagram depicts the sequence of causes and effects of an event that results in a disruption. The steps in creating a fault tree diagram include: Identifying the location of disturbances in the electrical distribution network Drawing fault tree based on identification of electrical distribution network Determining the Minimum Cut Set (Root Proble. The process of determining the minimum cut set is carried out after identifying the causes of damage at various levels of occurrence. From these levels, the most basic level can be determined, which will be the output of the minimum cut set, in the form of an event or combination of events that constitute the root cause. This is done by describing all the events that occurred and simplifying the repetition of the same basic event into a single basic event. The initial step in this research was to conduct a literature review by gathering information from various relevant sources. Next, an analysis of the factors causing network disruptions in the electricity distribution system was conducted, referring to the problem formulation in Chapter I. The data used were derived from experimental results and analyzed using the Fault Tree Analysis (FTA) method. The data obtained was then compiled and attached according to the findings in the following chapters. The data presentation is based on observations of network disruptions in electricity distribution. The findings of this study were then analyzed to draw conclusions, which are presented in the concluding chapter of the study. RESULTS AND ANALYSIS Data Processing Results. This stage is the process of collecting and processing data. Data is obtained from PLN's monthly reports, while data processing is carried out using a Fault Tree Analysis (FTA) Microsoft Excel software is used to assist with data processing and analysis. Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1871 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Table 1. Permanent Network Disturbance Data on Electricity Distribution Date Location / Feeder Feeder A - North Area Feeder B - West Area Feeder C - East Area Feeder A - North Area Feeder D - South Area Feeder B - West Area E Feeder - Central Area Feeder C - East Area Feeder A - North Area Feeder D - South Area Types of Disorders The main Short Circuit Ground Disturbance Phase to Phase Relationship Neutral Disturbance Duration of Interruption (Minute. Handling Status Damaged Finished Broken Finished Lightning Finished Finished Finished Finished Finished Finished Finished Finished Short Circuit Loose Distribution Cable cut by Overload Overload Phase Interference Ground Disturbance Burnt Damp soil/poor Neutral Disturbance Loose cable Voltage Disturbance Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1872 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Figure 1. Temporary disturbance data . nternal and externa. Table 2. Temporary network disruption data on electricity distribution Date Location / Feeder Feeder A North Area Types Disorders Feeder C East Area Feeder B West Area Feeder D South Area Lightning Disturbance Feeder A North Area E Feeder Central Area Feeder C East Area Feeder B West Area Mild Circuit Voltage Drop Flicker Lights Temporary Disruption Inrush Current Transient Voltage Disturbance Short Temporary Causes Sudden increase in load Lightning Duration (Minute. Frequency of Interference Animals . Large customer Lightning Stable Auto Recover Monitoring Safe Stable Checked Cleaned Switching Unstable Tree Handling Status Back Normal Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1873 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Feeder D South Area E Feeder Central Area Voltage Rise Temporary Disruption Sudden power Small animals Normal Auto Recover Distribution Network Disturbance Data Based on distribution network disruption data collected from internal reports of PT PLN ULP Balige during the periodMay 2023 to April 2024,it is known that there is a total of536 incidents of disruption, which is divided into two main categories, namelypermanent impairmentAndtemporary disruption. Internal permanent disturbancedominated by damage toMedium Voltage Network (MVNe. componentssuch as distribution transformers and isolators, with a total92 disturbances. External permanent disturbancemostly caused bynatural disasterssuch as fallen trees and lightning strikes, as many as108 Internal temporary disturbancereach137 incidents,generally caused by load surges and contact between conductors. External temporary disturbancebe the most dominant with a total199 disturbances,caused bykites, pennants, wild animals, and human Figure 2. Location of the Research Fault Tree Analysis (FTA) The Fault Tree Analysis method is used to identify the main root causes of electrical distribution system disruptions. The process begins by determiningTop Event,namely "Disruption in the Electricity Distribution Network. " This Top Event was then broken down into severalIntermediate EventsAndBasic Eventsthrough logic gatesANDAndOR,as follows: Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1874 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum Fault Tree Structure: Top Event: Disturbance in the Distribution Network Intermediate Event 1: Interference from Internal Factors Basic Event: JTM Damage Basic Event: Isolator Failure Basic Event: Overload Intermediate Event 2: Disturbance from External Factors Basic Event: Fallen tree Basic Event: Lightning strike Basic Event: Kite / foreign object Basic Event: Vandalism dentify Root Causes From the results of the FTA mapping, it was obtained thatthree main root causes of disordersbased on the highest frequency are: Disturbance from kites and pennants. incidents, 43. Internal JTM component damage. incidents, 17. Disruption due to extreme weather . ightning & fallen tree. incidents, 20. The analysis shows thatexternal disturbances are temporaryis the most dominant, and is mostly of acan be preventedwith a preventive approach, such as: Routine cleaning of the tissue area from foreign objects Public education about the dangers of kites near power lines Improved lightning protection and grounding systems While disturbances from internal factors indicate the need for: Periodic maintenance of JTM components Strengthening the distribution protection system Evaluation of the service life of electrical equipment Load Data The network used in this power loss calculation is the medium voltage network of January Ae June 2025 BLG 01 feeder of PT. PLN (Perser. ULP BALIGE as an example of calculating power losses with data. obtained in the field, namely: Table 3. Medium Voltage and Low Voltage Current Side Load Data BLG 01 PT. PLN (PERSERO) ULP BALIGE Name Branch English: BL01 BL02 TM FLOW (A) WHEN TR VOLTAGE (V) LOCATI VS- TR current (V) Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1875 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum BL09 BL15 BL17 BL18 BL26 BL27 BL28 BL38 BL39 BL42 BL43 BL48 BL55 BL67 BL71 BL75 BL76 BL80 BL83 BL86 BL87 BL90 BL93 BL94 Low voltage side load data is obtained from the measurement results at each distribution substation and is measured for each phase, namely load current (ITR), load voltage (VTR), and sometimes load power (STR) or calculated. explained in Table 4. Calculation of Load Current (ITM'). Load Voltage (VTM'). Load Power (STM'), is carried out at each distribution substation. The conductor used in this power loss calculation is a conductor with a cross-sectional area of 240 mmA for overhead lines and there are no line Conductor data is listed in the table CONCLUSION Based on the results of data analysis and the application of the Fault Tree Analysis (FTA) method to the electricity distribution network disruption at PT PLN ULP Balige, several things can be concluded as follows: Disruption of the electricity distribution networkat PT PLN ULP Balige during the observation period was dominated bytemporary disruption from external factors,with the highest number of incidents reaching234 disturbances,caused bykites, pennants, wild animals,and other foreign objects. From the internal side,damage to the Medium Voltage Network (JTM) components,such as distribution transformers, insulators, and conductor cables, are the main causes of permanent faults, with a total92 MethodFault Tree Analysis (FTA)successfully identified the cause-effect Diagnosis of Electricity Distribution Network Disturbances Using Fault Tree AnalysisAeRamli Mahaddin Hutajulu et. 1876 | P a g e INFOKUM Volume 13. Number 06, 2025. DOI 10. 58471/infokum. ESSN 2722-4635 (Onlin. https://infor. org/index. php/infokum relationships of the disturbances that occurred, and systematically described the root causes, both from internal and external factors. The fault tree mapping results show that most of the disruptions can be prevented through: Routine maintenance and replacement of worn components. Increasing public awareness not to fly kites near power lines. As well asinstallation of protective equipment such as lightning rods and automatic circuit breakerson the distribution network. The use of the FTA analysis approach has proven effective in supportingtechnical decision making and prevention strategiesfuture disruptions, so that it can improvereliability and continuity of electricity supplyto customers. REFERENCES